My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN | 87 <br />IMPLEMENTATION <br />Policy Action <br />Policy 3.5: Complete the citywide sidewalk net- <br />work. <br />Action 3.5a: Close sidewalk gaps throughout the city prioritizing roadways with greater than <br />25mph speed limit. <br />Action 3.5b: Require sidewalks as part of all roadway projects and new <br />development. <br />Policy 3.6: Prioritize the implementation of the <br />Focus Network identified <br />in the Bicycle and Pedestrian Master <br />Plan. <br />Action 3.6a: Incorporate Focus Network projects into the City’s Capital <br />Improvement Program (CIP) and track project delivery milestones. <br />Action 3.6b: Coordinate across departments to systematically integrate <br />Focus Network improvements into routine pavement resurfacing and <br />utility projects <br />Policy 3.7: Advance the implementation of the <br />broader Vision Network through flexible, interim <br />delivery strategies <br />Action 3.7a: Utilize quick-build methodologies and temporary materials to implement interim <br />safety and connectivity improvements along planned Vision Network corridors. <br />Policy 3.8: Design the walking and <br />bicycling network to safely accommodate a <br />diverse mix of active transportation modes, <br />including e-bikes, cargo bikes, and shared mi- <br />cro-mobility devices. <br />Action 3.8a: Review and update city bike facility design guidelines to ensure standard lane <br />widths and turning radii can safely accommodate increasing volumes of e-bikes and emerging <br />micro-mobility devices. <br />GOAL 4: SUPPORT SUSTAINABILITY Advance Climate Action Plan goals of reducing vehicle miles traveled by encouraging active transportation and decreasing reliance on automobiles. <br />Policy Action <br />Policy 4.1: Integrate bicycle and pedestrian plan- <br />ning with land use and development decisions to <br />support compact, connected, and sustainable <br />travel patterns. <br />Action 4.1a: Require bicycle and pedestrian connections as part of new development and <br />redevelopment projects. <br />Action 4.1b: Expand the complete streets program to include provisions for new develop- <br />ments to incorporate pedestrian and bicycle infrastructure and pathing within the develop- <br />ment.
The URL can be used to link to this page
Your browser does not support the video tag.