My WebLink
|
Help
|
About
|
Sign Out
_Agenda_Packet_092826
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
AGENDA PACKETS
>
2026
>
092826
>
_Agenda_Packet_092826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2026 3:28:31 PM
Creation date
9/24/2026 3:25:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/28/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2026 PLEASANTON BICYCLE AND PEDESTRIAN MASTER PLAN | 89 <br />IMPLEMENTATION <br />GOAL 5: ENSURE ONGOING MAINTENANCEMaintain existing and new bicycle and pedestrian facilities so they remain safe, comfortable, and accessible. <br />Policy Action <br />Policy 5.1: Develop a maintenance program <br />for bicycle and pedestrian facilities by 2028. <br />Action 5.1a: Maintain bikeways, including paved trails and separated bikeways, and side- <br />walks, with adequate sweeping, pavement repairs and vegetation trimming on a monthly <br />basis, or as directed by the City Traffic Engineer. <br />Action 5.1b: Work with the city’s existing maintenance reporting system and increase pub- <br />lic awareness of the existing system as a means to report bicycle and pedestrian facilities <br />needing repair and/or clean-up. <br />Action 5.1c: Allocate a percentage of each year’s CIP to trail, street maintenance and road- <br />way improvements along bicycle and pedestrian facilities. <br />Action 5.1d: Coordinate maintenance responsibilities across Public Works, Traffic Engi- <br />neering, Parks, and Utilities to ensure bikeways and sidewalks are maintained during routine <br />street and utility work. <br />Action 5.1e: Create protected bike lane sweeping schedule to be followed by public works <br />crew. The sweeping schedule should be posted on a website similar to the existing roadway <br />street sweeping schedule. <br />Action 5.1f: Regularly inspect and refresh pavement markings, wayfinding signage, and <br />curb markings to maintain visibility and clarity for people walking and biking. <br />Action 5.1g: Prioritize maintenance in high-use areas, high-injury corridors, school routes, etc to ensure safe and reliable access for all users. <br />Action 5.1h: Maintain pavement quality, striping, buffers, vertical separation elements, and <br />drainage to support low-stress conditions.
The URL can be used to link to this page
Your browser does not support the video tag.