Laserfiche WebLink
Resolution No. PC-2026-24 <br />Page Two <br /> <br /> <br /> <br /> <br /> <br />necessary public services and facilities are available, and the surrounding area is not <br />environmentally sensitive. Therefore, no additional environmental review is required. <br /> <br />Section 3: The Project is consistent with the adopted General Plan as it aligns with the <br />applicable land use designations and supports the General Plan’s Programs, Policies, and <br />Goals related to sustainability, community development, and industrial, commercial, and office <br />uses. Specifically, the Project would further applicable General Plan Land Use Element <br />policies and programs, including Sustainability Program 2.2, which encourages the reuse of <br />vacant and underutilized parcels and buildings within existing urban areas, and Industrial, <br />Commercial, and Office Policy 13, which seeks to ensure that commercial areas provide goods <br />and services needed by Pleasanton residents and businesses and the surrounding market <br />area. The Project would reuse existing commercial space within a developed business park, <br />utilizing existing infrastructure, parking, and access, thereby promoting efficient use of existing <br />development while providing an additional indoor recreational service for Pleasanton and the <br />surrounding community. <br /> <br />Section 4: Findings for Conditional Use Permit Approval <br />With respect to the approval of P26-0514, the Planning Commission makes the following <br />findings as required by Section 18.124.070 of the Pleasanton Municipal Code: <br /> <br />A. That the proposed location of the conditional use is in accordance with the <br />objectives of the zoning ordinance and the purpose of the district in which the <br />site is located. <br /> <br />The objectives of the Zoning Ordinance regarding conditional uses are to foster a <br />harmonious, convenient, and workable relationship among land uses; protect existing <br />land uses from inharmonious influences and harmful intrusions; and ensure that public <br />and private lands are ultimately used for purposes that are appropriat e and beneficial to <br />the City as a whole. The Property is regulated by Ordinance No. 928 and PUD-80-01- <br />15M and is zoned Planned Unit Development–Industrial (PUD-I), which permits or <br />conditionally permits a wide range of commercial, office, industrial, and quasi-public or <br />assembly uses. An indoor recreation facility is conditionally permitted within the PUD-I <br />District subject to approval of a CUP. <br /> <br />The proposed indoor recreation facility is considered a commercial use and is <br />consistent with the intent of the General and Limited Industrial General Plan land use <br />designation, which allows a range of industrial, commercial, office, and other compatible <br />assembly or community-serving uses when consistent with the Zoning Ordinance. The <br />activities associated with the use would occur entirely within an existing building and <br />would not involve manufacturing, outdoor storage, or heavy industrial activity. Industrial <br />and business park areas commonly accommodate indoor recreation facilities because <br />they offer adequately sized buildings, sufficient on-site parking, and physical separation <br />from residential neighborhoods, thereby reducing the potential for land -use conflicts. <br /> <br />Docusign Envelope ID: 7B549BED-D3DB-87EB-8171-DC1C0D2717F3