My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - UTILITY AGREEMENT
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - UTILITY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2026 2:18:51 PM
Creation date
9/28/2026 2:17:41 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
9/4/1990
LONG TERM AGREEMENTS - NAME
PACIFIC GAS AND ELECTRIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITY AGREEMENT NO. 789.6 <br />CITY OF PLEASANTON <br />PLEASANTON, CALIFORNIA <br />AND <br />PACIFIC BELL <br />DATE November 6, 1990 <br />CITY OF PLEASANTON, hereinafter called CITY proposes to construct a <br />freeway Interchange in Pleasanton at Hacienda Drive at I-580 and PACIFIC <br />BELL hereinafter called OWNER, proposes to install new telephone facilities <br />within the limits of CITY's project. <br />It is hereby mutually agreed that: <br />I. WORK TO BE DONE <br />The CITY shall install 6 new 4-inch fiberglass telephone conduits in the Hacienda <br />Drive/I-580 overcrossing structure for use by the OWNER to install future <br />telephone lines. All work shall be performed substantially in accordance with the <br />CITY's plans and specifications, a copy of which is on file in the City Engineer's <br />office at 200 Old Bernal Road, Pleasanton, California 94566. Minor deviations <br />from the above -described work may be made and incidental work performed by <br />the CITY when mutually acceptable to both parties and upon approval by the <br />OWNER. <br />II. LIABILITY FOR WORK <br />Installation of the facilities described in I above will be at 100 percent OWNER <br />expense. <br />Pacific Bell Liability, 100% $20,000.00 <br />Total Estimated Cost $20,000.00 <br />III. TIME AND PERFORMANCE OF WORK <br />CITY agrees to perform the herein -described work with its CONTRACTOR and <br />to provide and furnish all necessary labor, materials (except as noted in the <br />GENERAL CONDITIONS), tools, and equipment required therefor, and to <br />prosecute said work diligently to completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.