Page 2 of 5 <br />condition. However, the AMP analysis identifies specific assets that will require investment in <br />the near and mid-term to maintain reliable and functional service levels. <br /> <br />To help align available funding with the highest-priority infrastructure needs, staff developed <br />an asset investment approach that considers both asset condition and risk. Assets are <br />evaluated based on their condition, ranging from excellent and good to fair, poor, and failed, <br />as well as their probability of failure and consequence of failure. Because available funding is <br />substantially less than the total replacement value of the City’s infrastructure, the approach <br />focuses investment on assets where the need and potential service impacts are greatest. <br /> <br />For the near-term CIP, staff identified high-risk assets in poor or failed condition for priority <br />programming. For the mid-term CIP, staff identified high-risk assets in fair condition that are <br />expected to require investment before their condition deteriorates further. <br /> <br />The current analysis identifies approximately $23.6 million in assets that are both high risk and <br />in poor or failed condition and may require near-term replacement. An additional <br />approximately $66.0 million in assets are both high risk and in fair condition, representing <br />assets that may require mid-term investment to reduce the likelihood of future failure and <br />service impacts. <br /> <br />This risk-based approach provides a framework for translating AMP findings into a prioritized, <br />financially sustainable CIP while recognizing that not all assets can or should be replaced at <br />the end of their useful life. This allows the City to focus limited capital resources on the assets <br />where timely investment can best preserve service reliability, reduce risk, and avoid higher <br />future costs. <br /> <br />Assets are grouped into five main categories: transportation and streets, parks, facilities, <br />miscellaneous and stormwater, and fleet. Cemetery and stormwater assets are currently <br />tracked as non-enterprise-funded assets, as they are supported by the General Fund until <br />dedicated funding sources and revenues are identified. <br /> <br />Fleet assets were excluded from this analysis because they are programmed separately and <br />are not funded through the City's deferred maintenance or CIP funding. To further streamline <br />the next CIP programming effort, Civic Center assets were also excluded because the City <br />plans to undertake a comprehensive Civic Center Master Plan during the next CIP cycle. <br /> <br />After applying these exclusions, the resulting preliminary asset list includes approximately <br />$14.3 million in estimated asset replacement value for assets in poor or failed condition with <br />high risk, and approximately $61.0 million in estimated asset replacement value for assets in <br />fair condition with high risk. This is a high-level estimate that includes only assets in poor, <br />failed, or fair condition within the high-risk category. It does not include assets in moderate- or <br />low-risk categories. <br /> <br />The estimate reflects the cost to replace the assets themselves and excludes project soft <br />costs, such as engineering, design, project management, construction management, and <br />administration. Depending on project type and complexity, soft costs could increase total <br />project costs by an additional 30 to 50 percent. This estimate also does not include overall CIP <br />program contingency allocations or planning for future projects. <br /> <br />Page 36 of 46