My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10-6-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
100626 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 10-6-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2026 9:31:14 AM
Creation date
9/30/2026 9:30:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/6/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Optimizing and Maximizing Investment with Strategy <br />Objectives <br />•Maximize infrastructure risk reduction and service reliability within available funding <br />•Optimize the use of the resource and spending on all assets over many years, <br />getting the most from the bank through proper planning and implementation schedule <br />•Manage infrastructure risk and max service reliability with available funding <br />•Identify project bundling and efficiency opportunities <br />•Leverage alternative funding sources <br />132,450 Non-Enterprise Funded Assets <br />$3.4 billion Total Replacement Value <br />$80M in Fair Condition <br />$28M in Poor/Failed Condition <br />$108M identified as High Risk <br />*$61M Mid-Term <br />$14.3M Near Term <br />$60M High Risk+Fair <br />$24M High Risk+Poor/ Failed <br />205,700 Total Assets <br />$4.8B Total Replacement Value <br />Asset Management Analysis - Non-Enterprise Funded <br />Assets <br />Notes <br />1. Non-Enterprise Funded Assets: <br />Transportation & Streets, Facility, <br />Parks, Stormwater, Miscellaneous <br />infrastructure. <br />2. Streamlined Asset List exclude: <br />Enterprise, Civic Center, and <br />Fleet Assets <br />3.Total Replace Cost exclude project <br />delivery cost such as Engineering, Design, <br />Project Management, Construction <br />Management, Administration Cost. <br />5 <br />6 <br />Page 42 of 46
The URL can be used to link to this page
Your browser does not support the video tag.