Laserfiche WebLink
PC Resolution No. PC-2026-26 September 23, 2026 <br />the protective system, said system shall either be manufactured and installed <br />according to manufacturer recommendations, or designed by a registered <br />professional engineer and installed according to approved plans. No excavation <br />shall be performed atop or adjacent to a high-risk facility until authorized by the <br />owner of the facility. High-risk facilities are defined as gas transmission pipelines <br />and hazardous liquid pipelines as regulated by the U.S. Department of <br />Transportation Pipeline and Hazardous Materials Safety Administration (US DOT <br />PHMSA) <br />(Address this condition during construction) <br /> <br />78. POLLUTANT REDUCTION IN STORMWATER: At no time during construction <br />of the project shall pollutants be allowed to enter, clog, or contaminate storm <br />drain pipe networks or open stormwater channels in violation of Pleasanton <br />Municipal Code §9.14.080 et seq. The applicant shall contain all trash and <br />debris for proper disposal to authorized landfills or recyclers. Erosion control <br />features shall be deployed during the rainy season that extends from October 1st <br />to April 15th each year, or any time rain is forecast outside of this period. Best <br />Management Practices (BMPs) shall be strictly followed. Street sweepers must <br />be employed if soil or debris is tracked onto the public roads from vehicles exiting <br />the site. Standard BMPs are available from the California Stormwater Quality <br />Association (CASQA), the United States Environmental Protection Agency <br />(EPA), Caltrans, and others. Notes and/or illustrations shall be added to the <br />plans that describe the BMPs to be utilized during construction. The use of <br />manufactured erosion control woven blankets and straw wattles that utilize <br />plastic monofilament netting is specifically prohibited. (Address this condition <br />during construction) <br /> <br />79. SWPPP REPORTING: Copies of any monitoring and/or sampling reports <br />required by the stormwater pollution prevention plan (SWPPP) and submitted by <br />the Legally Responsible Person (LRP) to the State of California’s SMARTS <br />database shall also be submitted to the City of Pleasanton inspector assigned to <br />the project. The LRP shall also submit to the City a copy of the required Annual <br />Report no later than September 1st of each year that construction is active or <br />when erosion control features have been deployed. The report must include a <br />summary of all sampling and analysis performed (Risk Levels 2 and 3 only), a log <br />of all inspections performed, a summary of any required corrective actions taken, <br />and a summary of any violations. (Address this condition during construction) <br /> <br />80. DUST CONTROL: Dust control measures must be employed during all phases <br />of construction to prevent airborne nuisance to neighboring properties. All <br />stockpiles or unused materials that can create dust shall be covered or removed. <br />Exposed soil areas shall be routinely watered until surfacing materials or <br />landscaping is installed. Use of dust palliatives shall conform to Caltrans <br />Standard Specification Section 18. Any damage caused by airborne dust to <br />neighboring properties shall be cleaned with costs paid by the applicant. If the <br />applicant fails the address dust as directed by the City, the City shall have the <br />Docusign Envelope ID: A549EA74-ED4F-8CB2-8262-A310230CC465