My WebLink
|
Help
|
About
|
Sign Out
TAROB COURT PROPERTIES LLC
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
T
>
TAROB COURT PROPERTIES LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 2:40:36 PM
Creation date
10/7/2026 2:39:14 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
3/28/2022
LONG TERM AGREEMENTS - NAME
TAROB COURT PROPERTIES
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Right of Entry for Construction. <br /> a. Owner gives to City, its employees, and contractors a non-exclusive temporary <br /> right of entry for construction over, upon and across as shown in Exhibit A: <br /> i. the portions of the Property needed to install the improvements <br /> described in Section 1, above; <br /> ii. the Area "A" shall be used only for making landscaping <br /> Chick fil A landscaping rovements for <br /> the property and adjacent areas fo <br /> improvements; <br /> iii. the Area B shall be used for making improvements to the property and <br /> will be utilized as laydown or staging area; <br /> iv. The Area "C" shall be utilized only for sealcoating and striping the <br /> parking lot; and <br /> for the purpose of the City, at City's sole cost <br /> s to Owens Drive aIng improvements s generally shownanthe <br /> Hopyard Road between 1580 EB on/off p <br /> Exhibit B. <br /> b. City shall not commence work until Owner is given ten (10) business days <br /> advance notice. Construction of entire project is anticipated to be completed within one <br /> year. <br /> c. The anticipated duration to complete the improvements described in section <br /> will happen in serval phases during the project time frame and anticipated to be <br /> completed within one year. <br /> d. City and/or it's contractor will share project schedule at the beginning of the <br /> project and coordinate schedule changes with the owner that may impact access to the <br /> parking lot. <br /> e. City's contractor to repair damaged irrigation within twenty-four (24) hours of <br /> being notified of the incident and make complete restoration within thirty (30) days. <br /> f. The construction hours for the project will vary based on the allowable lane <br /> closure time established by the City's Traffic Engineer. It is anticipated that both daytime <br /> and nighttime working hours will be construction working utilized to hours, the property owner wstruct the project. In ill be notified by <br /> e event of <br /> major changes to the 9 <br /> City and/or contractor. <br /> g. The contractor drive aisle designated in the Exhibit A shall be used for access <br /> only and no parking nor staging will be permitted in the drive aisle. Construction vehicle <br /> parking shall be permitted in Area A or B only. Parking Areas "A" or "B" should be <br /> utilized only one at a time. No staging will be allowed in the Area "A". The Area "B" shall <br /> be utilized as staging or laydown area. <br /> h. Temporary construction easement Area "C" for parking lot sealcoating and <br /> restriping shall only be utilized by contractor during sealcoat & striping activities. No <br /> other work shall take place impacting other areas of parking lot and around 6111 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.