Laserfiche WebLink
DocuSign Envelope ID: BE74E31 B-F73A-4A43-, 98D4E6CBC6F5 <br />FIRSTCARBON <br />SOLUTIONST" <br />Key Issues <br />There are several key issues that will require evaluation in the EIR: <br />1. Measures PP and QQ <br />Proposal <br />The project includes grading within 100 feet of a ridgeline and also proposes grading on slopes in <br />excess of 25 percent. The city Is currently reviewing the application materials and may require <br />refinements to the site plan in light of Measure PP. <br />The project proposes the dedication of approximately 70 acres to EBRPD, which appears to meet <br />the intent of Measure QQ and Open Space Policy 6 to encourage the preservation of scenic <br />hillsides and ridgelines, and to study the feasibility of preserving large open -space areas in the <br />Southeast Hills by a combination of private open -space and a public park system. <br />�I • 1 <br />1 • � <br />Project Site <br />— Limit of Grading <br />HOFMI AMERICA 1 EUROPF I AFRK:A I AUSFM" 1 As1A <br />FIRSTCARBONSOLUTIONS.COM <br />