My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BE74E31B-F73A-4A43- •98D4E6CBC6F5 <br />FIRSTCARBON Proposal , <br />< < <br />space/public health and safety to residential use. LAFCO will require evaluation of the potential to <br />avoid or mitigate for the loss of open space acreage resulting from this proposed conversion, The <br />formal dedication of lands to EBRPD could be considered mitigation, and the assessment would <br />determine whether the dedication as permanent open space lands would be sufficient to offset <br />the impact. <br />FirstCarbon Solutions' Approach <br />FCS understands that our role as a consultant is to prepare legally defensible documents on schedule and <br />within budget. FCS strives to present technical information in a way that is readily accessible to the <br />public: using exhibits and graphics wherever possible to tell the story of the project. We also use <br />appendices to incorporate highly technical information so that the body of the document can maintain a <br />more reader -friendly tone and style. Our editors ensure that the Environmental Impact Report (EIR) <br />reads with a single voice and maintains consistent formatting and grammar. <br />As noted in the Request for Proposals (RFP), the key environmental issues that will require the most <br />extensive analysis in the CEQA document include aesthetics, biological resources, land use, utilities and <br />services, geology and soils, hydrology and water quality, and traffic and circulation, Accordingly, our <br />approach to the EIR will include a thorough analysis of these issues (along with all other CEQA topics) to <br />demonstrate the potential impacts that could result from the project, as well as the level of mitigation <br />that would be required to reduce those impacts. In the end, the purpose of the EIR is to provide factual <br />information that allows for informed public input and supports the City in their consideration of the <br />project application. <br />As requested by the City, FCS will also prepare drafts of all required CEQA notices, including the Notice of <br />Preparation (NOP) Notice of Completion (NOC), and Notice of Determination (NOD), for the City's <br />review, approval, and distribution. Our in-house legal counsel also regularly prepares Findings of Fact for <br />public agencies, and we are happy to provide this service as part of our core team. <br />FCS proposes a ten-month schedule starting in August 2018 and ending with a Final EIR in June 2019. <br />Our work plan includes peer review of technical studies and concurrent preparation of the EIR while the <br />transportation analysis is underway, allowing us to daylight any opportunities or constraints that could <br />affect the analysis, the schedule, or the budget. <br />Based on our long history of working with the City, FCS works proactively to identify opportunities for <br />streamlining. We raise issues early on for discussion, resolution, and Implementation of a preferred <br />strategy. As we have demonstrated on our other projects for the City, we will stay in regular contact with <br />the assigned planner (Natalie Amos) to ensure that the CEQA process stays on track. FCS's Project Manager <br />will schedule bi-weekly or monthly calls to provide a forum to discuss and confirm project status, <br />Our specific methods and practices for maintaining quality in our work are discussed below. <br />lVM11`I AMiRICA 1 EUROPE I APRKA I AU]tRAl1A I rNIA <br />FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.