My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign 5nvel6pe ID: BE74E31 B-F73A-4A43-A )8D4E6CBC6F5 <br />Task 3: Project Description, Project Objectives, and Alternatives <br />FCS will prepare a Draft Project description for review and comment by the City. The Project Description <br />will include a statement of project objectives as well as potential project alternatives that could be <br />evaluated. (Alternatives would be confirmed once the extent of potentially significant impacts are known). <br />FCS will revise the project description based on one round of consolidated comments from the City. <br />Task 4: Administrative Draft EIR <br />FCS will prepare an Administrative Draft EIR in accordance with the applicable requirements contained in <br />CEQA Guidelines Sections 15120 through 15132. The Administrative Draft EIR will contain analysis <br />supported by graphics and tables. The document will identify potentially significant impacts, feasible <br />mitigation measures, and the residual significance after mitigation has been implemented. The contents <br />of the Administrative Draft EIR will be as follows: <br />Executive Summary <br />In accordance with CEQA Guidelines Section 15123, the Executive Summary will contain a summary of <br />the project, list the project alternatives, identify areas of controversy, and provide a matrix listing <br />environmental impacts and mitigation measures, and the residual significance of all impacts. <br />Introduction <br />FCS will prepare the introduction including the purpose and background of the project, the determination <br />of the lead agency, scope of the EIR, and the document's organization. The introduction will establish the <br />scope of review of the EIR and identify environmental topics that had been previously evaluated at a <br />sufficient level in the prior rounds of environmental review and, thus, would not need to be re-evaluated. <br />Project Description <br />Pursuant to CEQA Guidelines Section 15124, the project description will identify the project location, <br />describe the project characteristics, list the project objectives, identify necessary approvals, and list <br />other agencies that may use the document. The project description will describe the relationship of the <br />project to the City's General Plan and use tables and color graphics to clearly convey relevant <br />information to the reviewer. <br />Environmental Setting, Impacts, and Mitigation Measures <br />The following specific sections that provide a discussion of environmental setting, impacts, and <br />mitigation measures (if applicable) will be prepared. <br />HORTHAMERICA I EURGK I AFRICA I AUSTRAL IA I ASIA <br />FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.