My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docu9ign Envelbpe ID: BE74E31B-F73A-4A43-F '?8D4E6CBC6F5 <br />dioxide, methane, and nitrous oxide. FCS will use BAAQMD thresholds of significance to evaluate the <br />project's construction and operational GHG emissions. In addition, FCS will analyze the project's <br />consistency with the City of Pleasanton's Climate Action Plan as required by CEQA. Changes to the <br />project that occur after completing the modeling analysis that require re -modeling will be considered <br />additional work that is not covered by this scope of work. <br />Assess Odor Exposure <br />The analysis will assess odor exposure to nearby residents. The discussion will compare the project to the <br />screening criteria and buffer distances prescribed by BAAQMD and the California Air Resources Board <br />(ARB). FCS will provide a qualitative analysis of the project's potential to generate an odor impact. Based on <br />the project land uses (i.e., residential), it is not anticipated that the project would result in an odor impact. <br />Assess Carbon Monoxide Hotspot Impacts <br />FCS will use the BAAQMD's screening criteria for carbon monoxide (CO) hotspots, which is anticipated to <br />be sufficient to dismiss any potential impacts. However, in the case that potential CO hotspots are <br />identified, FCS will use dispersion modeling to quantify impacts according to BAAQMD guidance under a <br />revised scope of work and budget. Quantitative CO Hotspot modeling would be considered additional <br />services, if required. <br />Construction -Related Health Risk Assessment <br />Based on the area of land to be disturbed, land uses developed, and proximity to sensitive receptors, FCS <br />anticipates that a construction -related Health Risk Assessment (HRA) will be necessary to evaluate the <br />project's construction -related toxic air contaminant (TAC) emissions. FCS will prepare a construction HRA <br />based on the recommended BAAQMD's Health Risk Assessment Guidelines (HRA Guidelines) (BAAQMD <br />2016) and Office of Environmental Health Hazard Assessment's (OEHHA) Risk Assessment Guidelines <br />(OEHHA 2015). The following tasks will be required for the construction HRA: <br />FCS will perform the following tasks as part of this analysis. <br />• Define what a sensitive receptor is and identify nearby sensitive receptors. <br />Identify health risk standards and acceptable cancer and acute and chronic non -cancer risk <br />thresholds from diesel emissions that are detailed in BAAQMD's thresholds of significance. <br />The following subtasks will be utilized to perform the construction -related HRA: <br />- Calculate the on -site construction equipment diesel equipment PM2.5 and total organic gases <br />emissions rates that were calculated in the AQ Analysis prepared for the proposed project. <br />Calculate the daily construction truck trip estimates used in the AQ Analysis and calculate each <br />truck trip's PM2.5 emissions rates through use of the EMFAC2017 model. <br />Model the diesel PM2,5 concentrations at representative nearby sensitive receptors associated <br />with the on -site construction equipment and off -site truck emissions up to 1,000 feet from the <br />project site through utilization of the AERMOD model, using the emissions rates provided in the <br />previous steps and the methodology described in the HRA Guidelines. <br />11MI AMFRWA I EURU216 I AiiMGA I AUSTRALIA I ASIA <br />FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.