My WebLink
|
Help
|
About
|
Sign Out
PONDERSOA HOMES - FIRST CARBON
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PONDERSOA HOMES - FIRST CARBON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:12:14 PM
Creation date
10/7/2026 3:09:28 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
4/26/2023
LONG TERM AGREEMENTS - NAME
PONDEROSA HOMES
LONG TERM AGREEMENTS - TYPE
REIMBURSEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: BE74E31 B-F73A-4A43--98D4E6CBC6F5 <br />Watershed. Dublin Creek and Devany Canyon Creek do not have listed impairments, however, Dublin <br />Creek and its tributaries have existing beneficial uses of warm freshwater habitat, wildlife habitat, water <br />contact recreation, and water non -contact recreation. Temporary best management practices (BMPs), <br />such as temporary erosion and sediment control, delineation of natural and/or sensitive areas, and site <br />management, will be required to reduce sediment and pollutants to the creeks during construction. <br />Site design measures include directing runoff from roofs and sidewalks to vegetated areas, minimizing <br />land disturbance and impervious surface, maximizing permeability, using micro -detention areas, <br />protecting sensitive areas, implementing self -treating areas, and implementing self -retaining areas. <br />Source control measures would be provided for storm drains, landscaping, outdoor equipment/materials <br />storage, fire sprinklers, and miscellaneous drain/wash water. Applicable low impact development (LID) <br />measures for the Project to treat the new impervious surfaces include bioretention areas. The Project <br />creates and/or replaces more than 1 acre of impervious surface and is within a white area with natural <br />creeks designated by the Alameda County Clean Water Program's (ACCWP) as susceptible to <br />hydromodification. Therefore, the Project is required to implement hydromodification management <br />measures. The LID measures can also be used as hydromodification management measures and will <br />adhere to the stormwater treatment and hydromodification management design criteria in the ACCWP's <br />C.3 Stormwater Technical Guidance and applicable requirements from the City of Pleasanton. <br />WRECO will perform a peer review of the documents for the Municipal Regional Permit (MRP) C.3 <br />stormwater treatment best management practices (BMP) compliance and risk level assessment for <br />compliance with the Construction General NPDES Permit. This includes review of BMPs sizing and any <br />hydromodification analysis performed. <br />Land Use <br />FCS will evaluate the project for consistency with the City of Pleasanton General Plan, including <br />Measures PP, QQ, and open space policies identified in the Land Use and Open Space Elements. FCS will <br />also evaluate the proposed conversion of lands currently designated Public Health and Safety to confirm <br />whether the proposed conversion would be consistent with the intent of relevant policies. <br />Noise <br />The proposed project contemplates construction and operational activities that could potentially expose <br />surrounding land uses to excessive noise and vibration levels. Of particular concern are temporary <br />increases in ambient noise levels during construction and permanent increases in ambient noise levels <br />for operational activities (e.g., vehicle trips, truck deliveries, mobile and stationary equipment, etc.). FCS <br />will prepare a Noise Analysis to evaluate the impacts of project -related construction and operational noise <br />on surrounding land uses. The analysis will be wholly contained in the EIR and the supporting technical <br />data will be appended. To perform this analysis, the following tasks are required. <br />Background Information <br />The general characteristics of sound and the categories of audible noise will be described. The regulatory <br />framework related to noise, including applicable City and County plans, policies, and standards will be <br />WRT" Ae4MCA I RMOt J "W-A I nir;rea rn I AMA <br />FIRSTCAR80NSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.