Laserfiche WebLink
DocuSign Ehvelvpe Id: BE74E31B-F73A-4A43-A0. __)D4E6CBC6F5 <br />FIRSTCARBON <br />SOLUTIONS <br />FCS INTERNATIONAL, INC. <br />"'MR 44 <br />1 <br />Proposal <br />compliance with C.3 guidance. Balance Hydrologics will characterize the nature of existing PFAs <br />pollution at and in the vicinity of the project and the potential for project to exacerbate known <br />problems. Findings will be documented in a peer review technical memorandum. <br />Land Use — As the Housing Element has been updated recently, FCS will review and revise the Land <br />Use section of the EIR to include new or revised goals and policies and determine the consistency <br />of the project with the projections and policies of the Housing Element. <br />Noise — New baseline noise levels will need to be measured. Full noise modeling and analysis will <br />be required. Other resource sections of the Administrative Draft EIR will be revised and updated to <br />reflect new thresholds or revised thresholds, such as the inclusion of full Wildfire and Energy <br />sections in the document and updating the project description throughout to account for the <br />incremental change in the site plan. <br />Population and Housing — FCS will recalculate the population growth from the proposed project in <br />light of current projections and evaluate the consistency of the project's population and housing <br />growth with the new Housing Element estimates and the General Plan. <br />Public Services and Utilities — Based on both changing conditions and the updated growth <br />projections, FCS will re -contact the public services and utility providers for the project site to <br />determine the adequacy of services such as fire and police and utilities such as water and <br />wastewater treatment facilities. <br />Visual Sims — FCS will complete new 3D modeling of the project as new plans have been <br />submitted. FCS will also determine if an additional site visit with new photography will be <br />necessary as existing conditions in surrounding areas may have changed. <br />New Wildfire and Energy —The CEQA checklist now includes wildfire and energy as separate <br />standalone sections. Especially given the increase in wildfires in recent years and public interest <br />and concern, we believe that these sections should be included in the body of the EIR, rather than <br />discussed in the "Effects Found Not to be Significant" section. <br />Task 2: Additional Meetings and Management <br />FCS currently has approximately $5,000 remaining in our budget for meetings and management. FCS <br />anticipates that we will attend a re -kickoff meeting with the City and applicant team as well as resume <br />regular meetings on a monthly basis to track progress and to discuss and resolve issues. Accordingly, FCS <br />requests an additional $9,443 to support ongoing management and meetings throughout 2023 as we <br />complete the Draft EIR for publication. Please note that the additional budget has been revised <br />downward more than 10 percent from the previously requested amount. <br />ADDITIONAL BUDGE. <br />The following table shows the estimated cost of each task included in this proposal. <br />NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA <br />FIRSTCARBONSOLUTIONS.COM <br />