Laserfiche WebLink
Aoft. <br /> A. Rough Grading and Improvement Plans for Tract 8112, THE RESERVE AT <br /> PLEASANTON prepared by Carlson , Barbee & Gibson, Inc.; Revised Bond Estimate <br /> for Tract 8112, dated June 19, 2012 and subsequent revisions to the plans,prepared by <br /> Carlson, Barbee & Gibson, Inc. and approved by the City Engineer and <br /> B. Landscaping and Joint Trench Plans for Tract 8112, THE RESERVE AT <br /> PLEASANTON prepared by Perkins Design and Lighthouse Design, and approved by <br /> the City Engineer. <br /> 3. Responsibility under NPDES Permit. Subdivider will work as either an"Approved <br /> Signatory" or a"Legally Responsible Person" (LRP) for Tract 8112 in reference to the NPDES <br /> General Permit for Storm Water Discharges Associated with Construction and Land Disturbance <br /> Activities. Subdivider shall perform all tasks required in that permit, including, but not limited <br /> to,the following items A-E, below: <br /> A. File Notice of Intent(NOI)prior to commencement of construction activity. <br /> B. All tasks related to said permit shall be in coordination with the Tract 8112 QSD,. <br /> C. Submit all "SWPPP's Revisions", "Annual Reports", etc. to State Water Resources <br /> Control Board or other information required by the above mentioned permit or <br /> requested by the Regional Water Quality Control Board, State Water Board, US EPA <br /> or Local Storm Water Management Agency. <br /> D. Any additional costs charged for work under this Agreement by the Regional Water <br /> Quality Control Board, State Water Board, US EPA or Local Storm Water <br /> Management Agency shall be paid by Subdivider. <br /> E. File Notice of Termination(NOT) in reference to State Construction General Permit <br /> and act as a"Approved Signatory" or LRP until the permit has been approved as <br /> completed and its measures deemed fulfilled by the applicable State regulatory <br /> agency and post-construction storm water management measures have been installed. <br /> 4 Inspection. City shall inspect all of said work through an inspector employed by City at the <br /> cost and expense of Subdivider, and Subdivider shall pay City the cost of such inspection as <br /> fixed by Ordinance. The City Engineer has tentatively fixed the inspection costs due upon <br /> execution of this Agreement as follows: <br /> $ 42,690.00 <br /> 5. Soils Report. Subdivider has provided a soils report as required by Government Code <br /> §§66490 et. seq. prepared by Berlogar, Stevens, and Associates and dated November 10, 2000 <br /> and December 21, 2011. <br /> 6. Plans. All of said work shall be done and materials furnished in strict accordance with the <br /> approved plans for said tract filed with the City Engineer, and in accordance with the standard <br /> specifications and details of the City of Pleasanton. It is further understood that the work and <br /> materials shall be under the supervision of the City Engineer, and performed and installed to his <br /> satisfaction. <br />