My WebLink
|
Help
|
About
|
Sign Out
TOLL CA XIX LP (2)
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
T
>
TOLL CA XIX LP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2026 3:23:11 PM
Creation date
10/7/2026 3:22:11 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
6/1/2012
LONG TERM AGREEMENTS - NAME
TOLL BROTHERS
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•► Alk <br /> include Developer and contractor contact numbers for residents' concerns. If good <br /> neighbor letter regarding demolition, as described in Section 2.d., above, includes <br /> mass grading information,then only one such letter is needed. <br /> 4. Responsibility under NPDES Permit. Developer will work as either an "Approved <br /> Signatory" or a"Legally Responsible Person" (LRP) for Tract 8112 in reference to the <br /> NPDES General Permit for Storm Water Discharges Associated with Construction and Land <br /> Disturbance Activities. Developer shall perform all tasks required in that permit, including, <br /> but not limited to,the following items A-E, below: <br /> A. File Notice of Intent (NOI)prior to commencement of construction activity. <br /> B. All tasks related to said permit shall be in coordination with the Tract 8112 QSD, <br /> Angelo Obertello, QSD 21001. <br /> C. Submit all "SWPPP's Revisions", "Annual Reports", etc. to State Water Resources <br /> Control Board or other information required by the above mentioned permit or <br /> requested by the Regional Water Quality Control Board, State Water Board, US EPA <br /> or Local Storm Water Management Agency. <br /> D. Any additional costs charged for work under this Agreement by the Regional Water <br /> Quality Control Board, State Water Board,US EPA or Local Storm Water <br /> Management Agency shall be paid by Developer. <br /> E. File Notice of Termination(NOT) in reference to State Construction General Permit <br /> and act as a"Approved Signatory" or LRP until the permit has been approved as <br /> completed and its measures deemed fulfilled by the applicable State regulatory <br /> agency and post-construction storm water management measures have been installed. <br /> 5. Inspection. City shall inspect all of said mass grading through an inspector employed by City <br /> at the cost and expense of Developer, and Developer shall pay City the cost of such <br /> inspection as fixed by Ordinance. <br /> The City Engineer has tentatively fixed the inspection costs due upon execution of this <br /> Agreement as six hundred forty five dollars and seventy five cents ($645.75). <br /> 6. Soils Report. Developer shall provide a preliminary soils report as required by Government <br /> Code §§66490 et. seq.. Said data shall be compiled by a qualified soils testing engineer <br /> without expense to the City. <br /> 7. Related Contracts and Proceedings. Any prior contracts between City and Developer and <br /> any prior approvals by Boards, Commissions or Council of City shall not be affected by the <br /> provisions of this Agreement unless specific modification is set forth herein. <br /> 8. Hold Harmless Agreement. Developer hereby agrees to and shall indemnify, defend and <br /> hold harmless the City, its elective and appointive officials, Boards, Commissions, officers, <br /> agents, and employees (collectively the "indemnities"), harmless from any liability for <br /> damage or claims for damage for personal injury, including death, as well as from claims <br /> from property damage which may arise, or allege to arise, from Developer's, Developer's <br /> contractors', subcontractors', agents', or employees' operation under this Agreement in <br /> performance of the mass grading or related work on the site. In addition to the above: <br /> Early Grading Agreement-Tract 8112 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.