Laserfiche WebLink
matters which are conditions precedent to the authority and ability <br />of DSRSD to obtain access to, acquire an interest in, and share in <br />the use/operation of the Facility must be, or have been, completed. <br />(ii) The design, acquisition and construction of the <br />Facility. <br />(iii) The right of DSRSD to have access to, and joint use <br />of the Facility including, initially, Phase I of the Facility and <br />ultimately, Phase II of the Facility. <br />(iv) The terms and conditions for use, ownership, <br />operation and maintenance of the Facility. <br />(v) The allocation between DSRSD and CITY of costs and <br />expenses for the acquisition (including, without limitation, <br />granting of credit to DSRSD for "the value of the land acquisition <br />costs assumed by DSRSD pursuant to its agreement with LIN described <br />in Article VI below), construction, management, operation and <br />maintenance of the Facility; and, <br />(vi) Reimbursement to CITY by DSRSD of the direct costs <br />incurred by CITY (less credits to DSRSD for, among other matters, <br />prior contributions for studies, and cost of the land acquisition <br />assumed by DSRSD and other such costs and expenses benefiting <br />CITY), prior to the implementation of a Joint Use/Operation <br />Agreement, to the extent such CITY -incurred costs redound to the <br />benefit of DSRSD. <br />(d) LIN's property shall receive a credit equal to the <br />value of the land dedicated to CITY (as established herein) for the <br />difference between DSRSD's basic district -wide zone water <br />connection fee (which fee shall be payable by LIN) and the sum of <br />said district -wide fee and any local zone water connection fees <br />(otherwise applicable to LIN's property within any local zone or <br />subzone); provided, that the aforesaid credit shall be limited to <br />the value of the land dedicated by LIN; provided, further, said <br />credit shall not be given or granted to LIN with respect to any <br />fees or charges allocable to LIN's land for pumping or providing <br />other facilities or services above and beyond normal or standard <br />local zone water distribution costs as determined by DSRSD. <br />Section 2.5. Valuation of the Property. <br />(a) LIN and CITY have obtained independent appraisals <br />of the Property which appraisals have resulted in different values. <br />LIN and CITY agree that the principle difference in value is as a <br />result of a difference in Highest and Best use.palculations; CITY's <br />appraiser using low -density residential and LIN's appraiser using <br />medium -density residential. In order to resolve this difference, <br />LIN and CITY agree to utilize the Land Use Designation to be <br />established by the City of Dublin pursuant to its on -going East <br />Dublin General Plan study. Accordingly, upon adoption of the <br />General Plan by the City of Dublin, the appraisal which most <br />Lin\docs\acquisit.agr <br />