Laserfiche WebLink
 Medians, Fire Stations & Main Street Landscape <br />Project No: PWD 26.301 <br />SCOPE OF WORK <br />Blowing of Main Street Sidewalk, Curbs, and Gutters <br />(These Special Provisions are to be used in conjunction with the City Standard Specifications <br />and Standard Details) <br />SECTION 1. DESCRIPTION OF WORK, GENERAL <br />The work to be performed consists of twice-weekly blowing of Main Street sidewalks, curbs, and <br />gutters in areas specified in Attachment V. Additional blowing to be performed as requested for <br />special Main Street events and will be billed as “additional services”. <br />SECTION 2. CLEANING STANDARD <br />The storefront-to-curb is blown out to the street, and the turn pockets are blown out so the street <br />sweeper can collect debris. No debris is to be left on the sidewalk. One worker on each side of <br />the street to perform the task. <br />SECTION 3. SERVICE TIME <br />Service is to begin at 157 Main Street and work toward the Pleasanton Hotel. Blowers must be <br />run at the lowest speed within 100 feet of the Rose Hotel located at 807 Main Street. Service <br />time will be from 6:00am – 6:45am and will be completed in coordination with the contact street <br />sweeper. <br />SECTION 4. EQUIPMENT <br />Battery-powered blowers are to be utilized for this scope of work (and for the entire contract per <br />the City’s gas-powered blower ban). This is to mitigate the noise and impact on the surrounding <br />neighborhoods. Contractor is responsible for charging all batteries off-site at their maintenance <br />facility. Portable generators are not allowed for charging batteries. <br />EXHIBIT A <br />Docusign Envelope ID: 0CA1C663-FC9F-8542-829D-EE33675CC266Docusign Envelope ID: F7F9ED3E-EB07-824E-82A3-2EC213332F32