Laserfiche WebLink
11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />EA <br />EA <br />EA <br />YD <br />HR <br />HR <br />Planter <br />Bowl EA <br />% Mark Up <br />Supply and install one 6 inch pop-up (Toro 570 or Hunter <br />Institutional Spray) <br />Supply and install one 1 inch remote control valve <br />(Griswold 2000) <br />Supply and install one 2 inch remote control valve <br />(Griswold 2000) <br />Supply and place one yard of wood chip mulch <br />Hourly rate for one operator and spray rig, including <br />material cost and markup <br />Hourly rate for one driver, one applicator, and truck- <br />mounted spray rig, including material cost and markup <br />Removal and replacement of all soil and amendments in one <br />Main Street planter bowl. <br />Percentage markup for materials as a percentage of the <br />actual invoice. Example: Material $1,000 + 10% ($100) = <br />$1,100 25% <br />$101.50 <br />$1,083.00 <br />$1553.00 <br />$192.00 <br />$169.00 <br />$294.00 <br />$319.00 <br />www.gachina.com | 650.853.0400City of Pleasanton <br />Design • Build • Maintain Regenerative Landscapes <br />BID FORM/RATE SHEET <br /> EXHIBIT BDocusign Envelope ID: 0CA1C663-FC9F-8542-829D-EE33675CC266Docusign Envelope ID: F7F9ED3E-EB07-824E-82A3-2EC213332F32