My WebLink
|
Help
|
About
|
Sign Out
SR 05:062
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2005 10:37:42 AM
Creation date
2/24/2005 9:37:35 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/1/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
solid waste ~isposal and imports in this permit, the footprint of the landfill expansion <br /> shall be limi~d to approximatety 250 acres. <br /> <br />Most of the followin[ Conditions of Appro.v. al, Nos. 7 to 82, are a condensation and <br />simplification of mitlgati0n measures identified in the Final EIR as revised which should not be <br />construed so as to di~ninish or eliminate responsibility of the operator for full mitigation of <br />environmental impad;ts identified in the Final EIR. In implementation of these Conditions of <br />Approval or in the e~{ent that a question arises as to how the operator or County shall proceed in <br />mitigation of impaet~, the Final EIR shall be consulted for guidance for a determination by the <br />Planning Commissiola. <br /> <br />Mitigation measures ~ere crafted to address the impacts identified for the original project and <br />will be sufficient to qover any situation created for the reduced project approved herein. Other <br />conditions reflect local, state and federal requirements that may not address specific mitigation <br />measures for impact.q identified as part of the EIR. These include legal liability, general <br />operational condifiofls, design, construction and regulatory standards, periodic review, and <br />various fees. <br /> <br />LAND USE <br /> <br />7. Buffer zones shall be retained on site around the perimeter of the landfill footprint <br /> substantially ~s indicated on Exhibit 1. <br /> <br />8. The operator ~hall apply to the Livermore Area Recreation and Park District to modify its <br /> 1991 Regional Trail Plan to recognize the proposed Class II Landfill Expansion project. <br /> Should a tral~ across or adjacent to Section 17 be constructed, the operator shall provide <br /> appropriate s~gnage and fencing around the portion of the wildlife mitigation area that is <br /> nearest the tr~l. <br /> <br />9. The operatori shall initiate site closure activities when the landfill achieves final grade. <br /> Closure and post-Closure Plans shall be designed such that the landfill would support <br /> agricultural ~ses after closure and reclamation. A program shall be prepared for <br /> submittal an4 review to the United States Department of Agriculture, Soil Conservation <br /> Service, for *estoration of the project site to agricultural capability. Upon closure, the <br /> project shalli be "visually integrated" with the surrounding terrain through sensitive <br /> grading and flevegetation with native plant materials. <br /> <br /> 10. As part of t~e required Site Development Review (SDR) for permitted development <br /> within the PI (Agricultural) District, the Alameda County Planning Department will <br /> review propdsed development of the legal building site parcels within 4,000 feet of the <br /> ALRRF ExPpaSion footprint for consistency and compatibility with surrounding uses. <br /> The operato4 shall provide reasonable funding for any study of the health and safety <br /> impacts of ~e ALRRF expansion on such development that the Planning Department <br /> reasonably d,termines is a necessary part of the SDR. <br /> <br /> 8-B <br /> Final Altamont Settlement - Exhibit B <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.