Laserfiche WebLink
<br />Finding: . Mitigation Measure 8-17 Feasible and Required <br /> <br />The city finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requ1r1ng the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigation 8-17 into the project design. The applicant and <br />successors in interest shall incorporate such downstream flooding <br />and sedimentation impact reduction provisions into project design <br />as a "Condition of Approval" to the project. <br /> <br />Groundwater <br /> <br />Impact: Potential for unstable ground conditions from groundwater <br /> <br />The City finds that improper placement of fill, grading which seals <br />off or exposes water bearing units, and prolonged or excessive <br />landscape irrigation may increase the potential for unstable ground <br />conditions. This is a potential significant impact (Draft EIR, <br />page 8-19). <br /> <br />Proposed Mitigation Measures of the EIR <br /> <br />The EIR identified the following mitigation measures which would <br />substantially avoid this impact. <br /> <br />8-19 Control drainage from springs or streams and from fills (Draft <br />EIR, page 8-19). Said mitigation measure was considered and <br />adopted with any pertinent changes in Condition 8-19, Exhibit <br />"B" of the Planning commission staff report dated May 27, <br />1992. <br /> <br />8-20 Control drainage of cut slopes (Draft EIR, page 8-19). Said <br />mitigation measure was considered and adopted with any <br />pertinent changes in Condition 8-20, Exhibit "B" of the <br />Planning Commission staff report dated May 27, 1992. <br /> <br />8-21 Evaluate effects of surface drainage system on groundwater <br />regime (Draft EIR, page 8-20). Said mitigation measure was <br />considered and adopted with any pertinent changes in Condition <br />8-21, Exhibit "B" of the Planning commission staff report <br />dated May 27, 1992. <br /> <br />Finding: <br />Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigations 8-19 through 8-22 into the project design. The <br />applicant and successors in interest shall incorporate such <br />groundwater impact reduction provisions into project design as a <br />"Condition of Approval" to the project. <br /> <br />Mitigation Measures 8-19 through 8-22 Feasible and <br /> <br />21 <br /> <br />- <br />