Laserfiche WebLink
<br />4. Mitiqation Measure 4-3: Provide an Eastbound to southbound <br />Riqht-Turn Deceleration Lane at the Proieot street Access <br /> <br />Who: Developer, under direction of City Traffic Engineer <br />What: Provide an eastbound to southbound right-turn <br />deceleration lane at the project street access to Sunol <br />Boulevard <br />When: Include as a condition of project PUD approval, with <br />striping improvements conceptually designed in conjunction <br />with tentative map application <br />Timing: Installation before acceptance of project street <br />improvements by city <br />Who verifies: city of Pleasanton Public Works Department <br /> <br />5. Mitiaation Measure 4-4: Provide Liaht at the Intersection of <br />sunol Boulevard at Arlinaton Drive <br /> <br />Who: Developer, under direction of City Traffic Engineer <br />What: Provide signal light <br />When: Include as a condition of project PUD approval <br />Timing: Before acceptance of project street improvements by <br />City <br />Who Verifies: city of Pleasanton Public Works Department <br /> <br />6. Mitiaation Measure 4-5: Dedicate Riaht-of-Wav for Sunol <br />Boulevard Ultimate Imcrovements and Construct Share of these <br />Imcrovements <br /> <br />Who: Developer, under direction of city Traffic Engineer <br />What: Dedicate right-of-way and construct share of ultimate <br />configuration for Sunol Boulevard <br />When: Include as a condition of project PUD approval, with <br />dedication indicated on tentative map. Construction should be <br />determined by city and rendered by developer at tentative map <br />approval <br />Timing: Before final map approval <br />Who Verifies: city of Pleasanton Public Works Department <br /> <br />Mitiaa~ion Measure 4-6: :Imcrove Haccv Vallev Road Between <br />carria_e Way and 1-680 undercrossina to city Standards <br /> <br />7. <br /> <br />Who: Developer, under direction of city Traffic Engineer <br />What: Widen Happy valley Road to a minimum of 34 feet with <br />two 12-foot travel lanes and two 5-foot bike lanes. This <br />includes drainage improvements to the SPRR trestle located <br />between 1-680 and Pleasanton/Sunol Road <br />When: Include as a condition of project PUD approval, with <br />improvements designed and approved by city prior to tentative <br />map approval <br />Timing: Before acceptance of project street improvements by <br />City <br />Who verifies: City of Pleasanton public Works Department <br /> <br />34 <br /> <br />II <br /> <br />. <br />