My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />37. Mitiaation Measure 8-21: Other Groundwater Considerations <br /> <br />What: Provide a pamphlet to individual homeowners cautioning <br />against over-irrigating landscaping areas <br />Who: Developer <br />When: As lots become available for purchase <br />Timing: As lots are purchased by individuals <br />Who Verifies: Pleasanton Planning Department <br /> <br />CONDITION 9: NOISE <br /> <br />38. Mitiaation Measure 9-1A: Noise Barriers to Minimize Traffic <br />Noise <br />What: Provide noise barriers <br />Who: Developer . <br />When: Prior to occupancy <br />Timing: During grading operations <br />Who Verifies: Pleasanton Planning Department <br /> <br />39. Mitiaation Measure 9-1B: 'Noise Barriers to Minimize Traffic <br />Noise (CUstom Lotsl <br />What: Preparation of noise mitigation for custom lots <br />Who: Developer of individual lots <br />When: Prior to application for design review <br />Timing: During construction <br />Who Verifies: Pleasanton Planning Department <br /> <br />40. Mitiaation Measure 9-2: Acoustical Treatment of Second Floor <br />What: Installation of acoustical treatment for second floors <br />Who: Developer <br />When: Prior to building permit issuance <br />Timing: During construction <br />Who Verifies: Pleasanton Planning and Building Departments <br /> <br />41. Mitiaation Measure 9-3: Minimize Construction Noise <br />What: Limit construction noise <br />Who: Developer <br />When: During construction <br />Timing: During constructio~ <br />Who Verifies: Pleasanton Planning and Building Departments <br /> <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.