Laserfiche WebLink
<br />ACTIA Bike/Ped Countywide Discretionary Fund Grant Agreement ACTIA #: A05-0033 <br /> Sponsor: East Bay Regional Park District <br /> ATTACHMENT B <br /> PROJECT DESCRIPTION <br />The Coordinated Funding Application submitted for Measure B Bicycle and pedestrian <br />Countywide Discretionary Funds, Cycle 2 (2005), is incorporated herein by reference. <br />Project Useful Life: Not applicable. <br />Project Description: <br />The East Bay Regional Parks District (EBRPD) will complete a feasibility study for the Alamo <br />Canal Trail undercrossing ofInterstate 580 and the BART tracks. This facility would close a <br />600-foot gap in the existing Alarno Canal Trail, creating a continuous 3.6 mile Class I bicycle <br />and pedestrian path. The Alamo Canal Trail connects the Iron Horse Trail in Dublin to the <br />Arroyo Del Valle Trail in Pleasanton. The feasibility study project is intended to create a <br />preferred design alternative and credible cost estimate that will advance this capital project by <br />bringing it closer to the construction phase. <br />This planning project will determine operationally-required elements, community-desired <br />elements and engineering challenges to building the trail. The project will produce a feasibility <br />study which will discuss the following: <br />. Community input on this trail segment, <br />. Engineering that will be required to build a trail crossing under the 1-580 freeway and <br /> BART line, <br />. Potential environmental and other impacts that must be considered for design and <br /> construction phases, <br />. Potential impacts of building a trail adjacent to a waterwaylflood control channel, <br />. Required permits, <br />. Required right-ot~way and all property rights involved in the project, <br />. Potential utility issues, <br />. Agencies/entities that must be involved or contacted about this project, <br />. A preferred design alternative, and <br />. Potential costs for project design, construction and maintenance. <br />The majority of this project budget (approximately 90%) will be used for the services of a <br />consultant who will complete the following tasks, at a minimum: kick-off meeting; base map; <br />existing conditions; field survey; engineering and geotechnical review; preliminary design; <br />CEQA initial study; stakeholders meeting; and the final feasibility study. <br />The EBRpD will work with the Cities of Dublin and Pleasanton as well as Caltrans, BART, <br />Zone 7 Water Agency, and the Hacienda Business Park Association in developing this project; <br />and will strive to develop a recommended design that is mutually agreeable to all parties. <br />Focused public outreach will be conducted as part of the project. <br />F :\Administrative\ACTIA\Agrct.'ments\Agrccments\Bikc & Pt.xfcstrian\Cycle 2_ BP _grants\AOS J)()33 _.Agrccmt."11t_ A lumo Canal <br />Trail Undercrossing_EBRPD.d()c Page 10 of 15 <br /> - <br />