My WebLink
|
Help
|
About
|
Sign Out
SR 06:060
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2007 4:06:08 PM
Creation date
2/15/2006 4:39:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3909 Vineyard Avenue Environmental Checklist <br /> <br />region is non- attainment under an applicable <br />federal or state ambient air quality standard <br />(including releasing emissions which exceed <br />quantitative thresholds for ozone precursors)? <br /> <br />d) Expose sensitive receptors to substantial pollutant D <br />concentrations? <br /> <br />D <br /> <br />~ <br /> <br />D <br /> <br />e) Create objectionable odors affecting a substantial D <br />number of people? <br /> <br />D <br /> <br />~ <br /> <br />D <br /> <br />Discussion <br /> <br />a-d) The proposed project is expected to generate short-term impacts related to construction <br />activities during site preparation (clearing! grubbing) and construction. There is <br />variability in construction activities making it difficult to precisely quantify the daily <br />emissions associated with the proposed project. During construction some equipment <br />may exceed some of the established BAAQMD emissions standards, however, <br />construction activity on the site is required to implement dust control measures (e.g., <br />periodic watering of the site, cover all trucks hauling soil, sand, and other loose material, <br />etc.) to control airborne particulate. All construction equipment is required to meet all <br />current exhaust standards for emissions. <br /> <br />Long-term operational emissions would be generated by both stationary and mobile <br />sources as a result of normal day-to-day activities on site subsequent to construction <br />completion. Stationary area source emission would be generated by the consumption of <br />natural gas for space (HV AC) and water heating devices and operation of landscape <br />maintenance equipment. Mobile source emissions would be generated by motor vehicles <br />traveling to and from the project site. <br /> <br />The proposed residential development will result in small, incremental, and insignificant <br />increases. Residential development is subject to the City's Growth Management Policies, <br />which are consistent with the area wide air quality management plan. Therefore, this <br />would be a less-than-significant-impact. <br /> <br />e) The proposed project will result in the construction of residential and open space uses and <br />will not result in producing objectionable odors. Therefore, this would be a less-than- <br />significant-impact. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.