Laserfiche WebLink
<br />Notes <br /> <br />MF Guide <br />Reference <br />PO 15 <br /> <br />tJ Adaptable Buildings: Universal Design <br />At least 50% of the development is designed to be accessible by all occupant types. This <br />includes, at a minimum, .these three measures: <br />- One zero-step entrance <br />- All main floor interior doors have 32 inches of clear passage space <br />_ At least a half bath is located on the ground floor of any 2-story unit <br /> <br />o Adaptable Buildings: Universal Design <br />At least 50% of the residences are designed to be ADA compliant in the future. This includes <br />strategies such as: sufficient blocking in walls for grab bars; adequate door widths and turning <br />radius; sleeping quarters and bathroom located on the ground level, etc. <br /> <br />PO 15 <br /> <br />o Adaptable Buildings: Adaptable Spaces <br />Mixed-use spaces are designed to accommodate future changes by maintaining open floor plans, <br />eliminating awkward spaces, and allowing for easy conversion to other occupant types or uses in <br />the future. <br /> <br />P015 <br /> <br />o Adaptable Buildings: UvelWork <br />Development provides integrated living and working quarters that promote the use of zero <br />commute homes. <br /> <br />PO 15 <br /> <br />Affordability: Area Median Income <br />Project includes a percentage of units for households making 80% or less of area median income. <br />See http://WWN.hcd.ca.gov/hpd/hrcJrepJstatelincNote.htrnl for 2005 county median income levels. <br />o 10% of all units <br />o 20% <br />o 30% <br />o 50% or more <br /> <br />o Affordability: Multiple Bedroom Units <br />Project includes at least one unit with 3 or more bedrooms for residents making 80% or less of <br />area median income. <br /> <br />iS~teIn(Q!k~ '~~'. -- _ 0 _- . _- -- _ -. p - -. . ,- - ~ ____d._ -. -- -. <br /> <br />~o~_. <br /> <br />o <br />o <br />o <br />o <br /> <br />- .- <br />- - ------ <br />C&D Waste Management: Waste Diversion <br />Reduce, reuse and recvcle waste created at the iobsile <br />Required: Divert 50% of construction and demolition waste from landfill disposal <br />Divert 65% <br />Divert 75% <br />Divert 80% or more <br /> <br />SW01 <br /> <br />o <br /> <br />Efficient Use of Construction Materials: Cut-pile <br />Project maintains a reuse pile (cut-pile) for wood, drywall, siding and other building materials. <br /> <br />SW02 <br /> <br />o <br /> <br />Construction IAQ Management: IAQ Management Plan <br />An IAQ management plan is written and followed for the project. II addresses these two issues: <br />protection of building materials and HVAC systems during construction AND clean-up procedures <br />prior to occupancy. <br /> <br />Construction IAQ Management: Building Flush-Out <br />A two-week building flush-out is pertormed after construction and before occupancy. <br /> <br />SW03 <br /> <br />o <br /> <br />SW03 <br /> <br />o <br /> <br />-- - . -- <br />Hazardous Materials & Waste: Hazardous Waste Management Plan <br />A hazardous waste management plan is written anq followed. <br /> <br />SW04 <br /> <br />,EjfraSr~diC~ --- - "_ ~..~ --- ~. _ - "" -: ---. - -==~ .' - ---:q=- <br /> <br />o Innovative Design <br />Provide a narrative describing green building aspects that go above and beyond these Multifamily <br />Green Building Guidelines. Include design strategies or methods that exhibit exemplary <br />pertormance in certain areas OR green building aspects not found within the Guidelines. <br /><Insert Narrative Here> <br /> <br />o Innovative Design <br /><Insert Narrative Here> <br /> <br />o Innovative Design <br /><Insert Narrative Here> <br /> <br />,~ GREeJ StHLDJiIlG <br />...~ "'_'~("'17 <br /> <br />Version 1.0. May 2005 <br /> <br />Page 5 ofl2 <br />