Laserfiche WebLink
23- Oct -97 <br />08:55:10 AM <br />QTR2ST97 <br />STREET PROJECTS <br />FISCAL YEAR 1996 -97 (QTR 4) <br />TABLE 1 <br />STREETS PROJECTS <br />CIP# PROJECT DESCRIPTION <br />FUNDED PROJECTS <br />1996 -97 RECOMMENDED FINAL <br />ADOPTED QTR4 ADJUSTED 1997 -98 <br />ADOPTED CARRYOVER & 1996 -97 BUDGET ACTUALS CARRYOVER & <br />1996 -97 AMENDMENTS AMENDMENTS 1996-97 1996 -97 AMENDMENT <br />852034 St. John Storm Drain 30.000 30,000 0 30.000 <br />885021 Pavement Manager Software 11,853 11.853 533 _ 11.320 <br />895021 Bernal Bridge Painting 443.262 443,262 8.038 435.224 <br />905006 Main St. Pavement & Utility Reconstruction -Phase I , 4.175 4.175 0 4.175 <br />905022 Storm Drain Extension Kottinger to Amaral Circle 4,382 4.382 0 4.382 <br />915033 Hopyard Landscape Improvement -Black to Del Valle 32.957 32.957 0 32.957 <br />925021 Interim Parking -Main St. Construction 8.695 8.695 0 8.695 <br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho /CC CTY 606.393 606,393 455.277 151.116 <br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pleas Canal 150,000 150.000 33.809 116.191 <br />935030 Extension of Livingston Way 12.000 12.000 0 12.000 <br />935043 Resurface Various City Parking Lots 35,000 35,000 35.000 0 <br />935045 Removal of Old Bernal Bridge Foundations 22.500 22.500 0 22.500 <br />945029 Extension of Junipero Street 1,217.257 1217.257 1,217 257 0 <br />945031 Installation of New Sidewalks 15,490 15.490 0 15.490 <br />945032 Vineyard Avenue Soundwall 32.216 32.216 32.216 0 <br />)45034 Arroyo Mocho Slope Repairs at Hopyard Bridge 2.192 2.192 2,192 0 <br />155003 Annual Resurfacing Various City Streets 19.399 19.399 19.399 0 <br />155004 Annual Slurry Seal Project 96,331 96.331 96.331 0 <br />155006 Annual Street Light Upgrade 10.000 10.000 0 10,000 <br />155027 Installation of New Sidewalks & Handicap Ramps 64,450 64,450 37.740 26.710 <br />155028 Drainage Improvements at Neal Street and Railroad Street 10,000 10.000 0 10.000 <br />165003 Annual Resurfacing Various City Streets 744,000 204,403 160600 965,003 382.112 582.891 <br />65004 Annual Slurry Seal Project 70,000 8.189 78.189 3,945 74.244 <br />65005 Annual Traffic Loop/Pavement Replacement 20.000 20,000 0 20,000 <br />65006 Annual Street Lighting Upgrade 10.000 10,000 0 10.000 <br />65007 Annual Traffic Button and Line Markers 25,000 25.000 0 25,000 <br />65020 Pleasanton Ave Reconstr (Rose Ave - St John @ UPRR) 1996 -97 388,800 (34.822) 353,978 351,979 1.999 <br />65019 Traffic Signal Interconnect; Bernal at Independence (1996 -97) 75,000 75.000 0 75,000 <br />65021 Bridge Painting (1996 -97) 45.000 45,000 0 _ _ 45.000 <br />65015 Internally Illuminated Street Signs (1996 -97) 16.000 16.000 0 16.000 <br />TS: Valley Ave & Paseo Santa Cruz/Via de Los Milagros (1997 -98) 0 <br />Stanley Blvd Improve :East of California St to Reflections (1999 -00) 0 <br />65035 Mohr Ave. Soundwall 69,000 69,000 ' 180 68.820 <br />55054 Hopyard Median/Parkway Renorvation 41,068 51317) 32,751 31,374 1,377 <br />65038 Foothill Road Emergency Repairs 24.970 24,970 24,968 0 <br />65045 W. Las Positas Interchange Study 225.000 225.000 19,607 205,393 <br />Partial Funding From Outside Sources <br />45036 Santa Rita Rd Resurfacing (Rosewood - W. Las Positas) <br />45037 Rose Avenue Reconstruction (Pleasanton Ave to Fair St) <br />45057 Hopyard Rd Resurfacing (Stoneridge Dr. to N. of Owens) <br />55029 First Street Bridge at Arroyo Del Valle; Interim Improve (ISTEA/HBRR) <br />65022 Hopyard Rd Resurfacing; Stonerdige Dr. Arroyo Mocho (1996 -97) <br />65042 Main St Bridge Seismic Retrofit <br />68039 Vineyard Ave. Median Landscaping (see Misc. CIP) <br />100% Funding From Outside Sources <br />56001 Stoneridge Drive at Santa Rita Improvements -NPID I <br />Santa Rita at Valley; Intersection Improvements (1996 -97) -NPIDI <br />56002 Hopyard Road at Owens Drive Channelization (1996 -97) NPID I <br />75038 Owens Drive Improvements <br />Extension of Livingston Way (1998 -99) <br />)5005 Emergency Vehicle Access Crossing @ St John <br />55999 Vineyard Ave. - S- Curve Realignment <br />55057 Canyon Way Widening <br />STREET PROJECT TOTAL <br />PARTICIPATION BY OTHER FUNDS <br />965020 !SEWER FUND: Pleasanton Ave. Reconstruction <br />423.000 <br />613,000 <br />654.717 <br />2,613 <br />312.568 <br />(170,797) <br />75,000 <br />8,317 <br />654.717 398,463 256,254 ' <br />2,613 2,613 i 0 <br />735.568 428,6561 306.912 <br />442.203 0 442,203 <br />75.000 21 74,979 <br />8,317 0 8,317 <br />175,000 <br />175,000 <br />o{ <br />175,000 <br />30,000 30,000 , 0 j 30,0001 <br />16,8941 (16,894) <br />80,700 80,700 81,915 0 , <br />37,370 37,370 37,370 0- <br />260,000 260,000 35,242 224,758 <br />j <br />1 S2,788,11001 -' S4,346,461 5134,670 $7,269,931: 53,753,131 : 53,518,013 j <br />(5147,500) 556,771 <br />945029 WATER FUND: Extension ofJunipero (543,525) <br />STREET TOTAL <br />(90,729) (90,729) <br />(43,525) (43,525 <br />o <br />S2,641,300 $4,359,7071 5134,670 57,135,697-53,618,877 53,518,0131 <br />