Laserfiche WebLink
20- Nov -97 <br />09 34 47 AM <br />Q7RINT98 <br />WATER PROJECTS <br />FISCAL YEAR 1997 -98 (QTR 1) <br />TABLE 4 <br />CIP # PROJECT DESCRIPTION <br />. REP! CEMENT &IMPROVEMENT PROJECTS <br />RECOMMENDED FINAL <br />1997 -98 QTRI ADJUSTED <br />ADOPTED CARRYOVER & ADOPTED 1997 -98 BUDGET <br />1997 -98 AMENDMENT AMENDMENTS AMENDMENTS 1997 -98 <br />808046 Utility Billing Software <br />921012 First St. and Kottinger Tie -in <br />921037 Wells 6 & 7 Repairs <br />931016 Corrosion Controls <br />931018 ;Water Service Study <br />931022 !Update Standard Specifications and Plans <br />941010 !Annual Electrical Panel Restoration <br />941019 ;Reconstruct Control Valves: Santos Ranch Rd.-Phase II <br />941023 'Motor Control Valve Foothill 8 Million Gallon Water Storage <br />941024 Automated Ion Analyzer <br />941026 ;Telemetry Central Computer Modifications <br />941027 ;Seismic Vulnerability Study <br />948056 ILease/Installment Payments (Series A & B Bonds) (67 %) <br />951000 Annual Water main Replacement and Improvement Project <br />951010 Annual Electrical Panel Restoration <br />961016 ;Motor and Pump Replacement at Water Pump Stations (100 %) <br />951018 ;Completion of New Lining, Coating, Cathodic Protection: 510/1300 <br />961018 ;New Lining & Coating: Water Tanks 1100 & 1600 (1996 -97) <br />951015 ;Water Quality Monitors - Phase II (50 %) <br />961000 Annual Water Main Replacement and Improvement Project (100 %) <br />961011 Annual Control Valve Installation (100 %) <br />961010 Annual Electrical Panel Restoration (100 %) <br />961017 Backflow Devices (100 %) <br />961020 Replace RTU'S/Equipment at Pump Stations (100 %) <br />971025 Water Well Chemical Feed System Modifications. (67 %) <br />971011 'Control Valve Installation <br />971000 Replace Backhoe No. 322 <br />971002 ;Replacement of Polybutylene Service Laterals <br />971005 !Water System Replacement/Improvement Study Update <br />971009 Alarm Dialing System <br />971010 Electrical Panel Upgrading <br />971012 i Water Main Replacement on Bonita Avenue and Entrada Dr. <br />971018 Lining & Coating - Steel Water Tanks <br />NPID 2B Funded Projects <br />969001 Tassajara Reservoir Expansion <br />959001 Foothill Lower Zone Water Trans Line- N of W Las Positas <br />949004 ,Foothill Water Line - N of Castlewood <br />949005 Verona Rd Bridge Water Line <br />949006 ;Longview Dr Water Line <br />949007 'Longview Dr Pump Sta Capacity Upgrade <br />949008 ;Foothill Water Line - N of Castlewood, Phase II <br />949002 ;Tassajara Reservoir Roof Repair <br />'TOTAL REPLACEMENT/IMPROVEMENT <br />ENDING REPLACEMENT FUND BALANCE JUNE 30,1998 <br />1.091 1.091 <br />25.000 25.000 <br />35,018 35.018 <br />50,201 50.201 <br />25,000 25.000 <br />3,718 3.718 <br />43,140 f 43,140 <br />117.500 117,500 <br />5,309 5.309 <br />35,000 35,000 <br />1,845 1.845 <br />35,000 35.000 <br />576,412 576.412 <br />434,424 434,424 <br />5,712 5,712 <br />10,075 10.075 <br />91,678 91,678 <br />380,511 380,511 <br />14,206 14.206 <br />286.788 286,788 <br />38,647 38.647 <br />15,000 15.000 <br />15,287 15.287 <br />2,030 2,030 <br />110,000 110,000 <br />25,000 25,000 <br />66,800 66,800 <br />50,000 50,000 <br />15,000 15,000 <br />13,500 1 13,500 <br />42,000 42,000 <br />303,800 303,800 <br />228,000 ! 228,000 <br />7,846 <br />120,000 <br />6,239 <br />11,011 <br />36,545 <br />270,028 <br />221,105 <br />7,846 - <br />(30,000) 90,000 <br />6,239 <br />11,011 <br />36,545 <br />270,028 <br />221,105 <br />30,000 <br />30,000 <br />51,430,512 S2,344,954 <br />SO SO S3,775,466 <br />52,501,443 <br />51,581,378' <br />0 <br />$2562,804: <br />