Laserfiche WebLink
19- Nov -97 <br />02:54:15 PM <br />gtrl sw98 <br />SEWER PROJECTS <br />FISCAL YEAR 1997 -98 (QTR 1) <br />TABLE 5 <br />CIP# PROJECT DESCRIPTION <br />REPLACEMENT & IMPROVEMENT PROJECTS <br />RECOMMENDED FINAL <br />1997 -98 QTRI ADJUSTED <br />ADOPTED CARRYOVER & ADOPTED 1997 -98 BUDGET <br />1997 -98 AMENDMENT AMENDMENTS AMENDMENTS 1997 -98 <br />872066 :Lease Payments (Crosstown Sewer Interceptor -45 %) 204,866 <br />872066 :Crosstown Repairs 60,267 , <br />872068 :East Amador Trunk Sewer Rehabilitation 80,307 (17,614) <br />902028 I Vineyard/Arroyo Del Valle Sewer Additions 455,514 <br />932025 Update Standard Specifications and Plans 6,218 <br />942001 Annual Maintenance Hole Improvement Project 17,500 <br />948056 Lease/Installment Payments (Series A & B Bonds) (67 %) 149,489 <br />952002 Annual Sanitary Sewer Replacement and Improvement 234,102 <br />952012 Annual Pump Station Electrical & Control Restoration 31 <br />952024 Sewer Pump Station. Adjustable Frequency Drive (S- 6,7,8) 13.085 <br />952025 ;Emergency Generator Load Banks (S -7,8) 6,886 <br />952008 :Annual Radio Telemetry Conversion (67 %) 124 <br />952023 'Multi Conductor TV Guide (50 %) 536 <br />962008 lAnnual Radio Telemetry Conversion (67 %) 9,442 <br />962002 :Annual Sanitary Sewer Replacement and Improvement (100 %) 199,467 <br />962012 Annual Pump Station Electrical and Control Restoration (100 %) 11,483 <br />962001 Annual Sewer Maintenance Hole Improvement (100 %) 8,953 <br />962024 Sewer Pump Station Adjustable Frequency Drive (S- 6,7,8) (100 %) 21.368 <br />972008 Annual Radio Telemetry Conversion 26,667 <br />972001 Sewer Maintenance Hole Improvement 20.000 <br />972022 Sanitary Sewer main Replacement on Division Street and Pleas. Ave 204,700 <br />972024 S -5 Bank Repairs - Phase II 50,000 <br />972026 Sanitary Pump Station #6 - Wet Well and Pump Station 12,000 <br />972028 Sewer System Replacement/Improvement Study Update 15,000 <br />972029 (Flow Telemetry for East Amador and Highland Oaks Siphons 14,000 <br />972030 Sanitary Pump Station Control and Mechanical Schmatics 11,000 <br />972031 !Sanitary Pump Station, Adjustable Frequency Motor Drives 25,000 <br />972032 IAir Injection Control System Improvements 12,000 <br />872068 Loan Permits to Expand Fund: East Amador Sewer Rehab 105,000 175,000 <br />902028 Loan Permits to Expd Fund: Vineyard Ave /A.D.V. Add (1997 -98) 100,000 <br />Subtotal Replacement/Improvement Projects <br />'Replacement/Improvement Participation with Street projects: <br />965020 IPleasanton Ave. Reconstruction: Rose - St John (1996 -97) <br />204.866 <br />60.267 <br />62.693 <br />455,514 <br />6.218 <br />17,500 <br />149,489 <br />234,102 <br />31 <br />13,085 <br />6,886 <br />124 <br />536 <br />9,442 <br />199,467 <br />11.483 <br />8.953 <br />21,368 <br />26,667 <br />20,000 <br />204,700 <br />50,000 <br />I2,000 <br />15,000 <br />14,000 <br />11,000 <br />25,000 <br />12,000 <br />280,000 <br />100,000 <br />949,722 1,300,283 (17,614) 0 2,232,391 <br />!Subtotal participation projects <br />'TOTAL REPLACEMENT/IMPROVEMENT PROJECTS S949,722 S1,300,283 (S17,614) $0 S2,232,391 <br />ENDING REPLACEMENT/IMPROVEMENT BALANCE i 483,257 j 491,2751 17,6141 0 452,194'. <br />