Laserfiche WebLink
WATER PROJECTS <br />FISCAL YEAR 1997-98 (QTR 2) <br />TABLE 4 <br />f <br />- REP)(,ACEMENT & IMPROYEINENT PROJECTS <br />RECOIvfH~NDED FINAL <br />1997-98 QTR 2 ADJUSTED <br />ADOPTED CARRYOVER 8c ADOPTED 1997-98 BUDGET <br />PROJECT DESCRIPTION 1997-9a AMENDMENT AMENDI~NTS AMENDtvIENTS 1997-98 <br />Utility Billing Software <br />First St. and Kottinger Tie-in <br />Wells 6 & 7 Repairs <br />Corrosion Controls <br />Water Service Study <br />Update Standard Specifications and Plans <br />Annual Electrical Panel Restoration <br />Reconstruct Control Valves: Santos Ranch Rd.-Phase II <br />Motor Control Valve Foothill 8 Million Gallon Water Storage <br />Automated Ion Analyzer <br />Telemetry Central Computer Modifications <br />Seismic Vulnerability Study <br />Lease/Installment Payments (Series A & B Bonds) (67%) <br />Annual Water main Replacement and Improvement Project <br />Annual Electrical Panel Restoration <br />Motor and Pump Replacement at Water Pump Stations (100%) <br />Completion of New Lining, Coating, Cathodic Protection: 510/1300 <br />New Lining & Coating: Water Tanks l 100 & 1600 (1996-97) <br />Water Quality Monitors -Phase II (50%) <br />Annual Water Main Replacement and Improvement Project (100%) <br />Annual Control Valve Installation (100%) <br />Annual Electrical Panel Restoration (100%) <br />Backflow Devices (100%) <br />Replace RTU'S/Equipment at Pump Stations (100%) <br />Water Well Chemical Feed System Modifications. (67%) <br />Control Valve Installation <br />Replace Backhoe No. 322 <br />Replacement of Polybutylene Service Laterals <br />Water System ReplacemenVImprovement Study Update <br />Alarm Dialing System <br />Electrical Panel Upgrading <br />Water Main Replacement on Bonita Avenue and Entrada Dr. <br />Lining & Coating -Steel Water Tanks <br />NPID 2B Funded Projects <br />Tassajara Reservoir Expansion <br />Foothill Lower Zone Water Trans Line- N of W Las Positas <br />Foothill Water Line - N of Castlewood <br />Verona Rd Bridge Water Line <br />Longview Dr Water Line <br />Longview Dr Pump Sta Capacity Upgrade <br />Foothill Water Line - N of Castlewood, Phase II <br />Tassajara Reservoir Roof Repair <br />TOTAL REPLACEMENT/IMPROVE~tENT <br />FUND BALANCE JUNE <br /> 1,845 (1,845) 0 <br /> 35,000 35,000 <br />576,412 _ 576,412 <br />_ 434,424 434,424 <br /> 5,712 _ <br />(5,712). 0 <br /> 10,075 10,075 <br /> 91,678 (91,678) 0 <br /> 380,511 (380,51 I )' 0 <br /> 14,206 14,206 <br /> 286,788 286,788 <br /> 38,647 (32,925)' 5,722 <br /> 15,000_ _ 15,000 <br /> 15,287 ~ 15,287 <br />_ 2,030 17,260 19,2 <br />90 <br /> <br />110,000 _ _ <br />25,000 ___ ___ <br />__ <br />_ _ <br />_ ~ <br />_ _3_2,925 _ <br />_ <br />110,00_0 <br />57,925 <br /> <br />66,800 __ _ <br />50,000 __ _ <br />l 5.000 _ __ <br />__ <br />____ _ <br />66.800_ <br />50,000 <br />15.000 <br />13,500 _ 1,845 _ 15.345 <br />42,000 5,712: 47,712 <br />303,800 303,800 <br />228,000 472,190 ' 700,190 <br /> <br /> ?,846 ~ 7,846 <br /> 120,000 (30,000) 90,000 <br /> 6,239 (6,239) 0 <br /> 11,011 (5,182), 5,829 <br /> 36,545 58,863 95,408 <br />' 270,028 (28,863)' 241,165 <br /> 221,105 221,105 <br /> 30,000 30,000 <br />47 <br />1,091 1,091 <br />