My WebLink
|
Help
|
About
|
Sign Out
RES 96088
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1996
>
RES 96088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 8:32:17 AM
Creation date
2/24/1999 6:49:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
treated wastewater to the deep waters of the San Francisco Bay. The <br /> LAVWMA pipeline has a current capacity of 21.0 MGD. <br /> <br /> In 1993, Pleasanton, Livermore, and DSRSD estimated that a total <br /> capacity of 32.4 MGD, during dry weather, would be necessary for <br /> buildout of the General Plans in their respective service areas. <br /> LAVWMA is now considering alternatives for additional export. Further, <br /> DSRSD is proceeding to plan a 2.5 MGD advanced treatment <br /> demonstration project to allow reuse of wastewater within the Valley, <br /> thereby increasing disposal capacity for DSRSD and Pleasanton. <br /> <br /> In 1993, Pleasanton estimated that a total capacity of 11.3 MGD would <br /> be needed to accommodate buildout of the General Plan, plus allow for <br /> some potential future General Plan changes. Of the 21.0 MGD of the <br /> existing LAVWMA facilities, Pleasanton's capacity is 7.5 MGD. <br /> Therefore, Pleasanton's request to LAVWMA and DSRSD has been to <br /> increase capacity by 3.8 MGD (from 7.5 MGD to 11.3 MGD). Assuming <br /> successful negotiation with EBDA, demonstration of the advanced <br /> treatment and reuse/export project by DSRSD, and/or other alternatives, <br /> Pleasanton's additional wastewater needs will be provided. <br /> <br />b. Water <br /> <br /> The adequacy of Pleasanton's water system depends on the supply of water <br /> available and the capacity of storage facilities and distribution systems to deliver <br /> water on demand. Water supplies must be capable of meeting maximum day <br /> demands; storage must be capable of meeting peak-hour demand in addition to <br /> fire flow volumes and an emergency reserve; and the distribution system must be <br /> able to provide required flows at adequate pressures throughout the system. <br /> <br /> Pleasanton's current contract with Zone 7 allows the City to use a maximum of <br /> 3,500-acre-feet per year (an average of 3.1 million gallons per day) from <br /> groundwater with the remainder to be obtained from Zone 7. Zone 7 has <br /> projected that it can supply sufficient water supplies to meet the City's future <br /> needs assuming that it receives an average of approximately 75 percent of its <br /> contractual allocation from the State Department of Water Resources and that this <br /> supply is supplemented with other planned water supply sources. These <br /> additional sources include more imported surface water, water transfers, water <br /> conservation, water recycling, and enhanced conjunctive use of the groundwater <br /> basin. In order to meet future needs, based on buildout of its customers' General <br /> Plans, Zone 7 plans to provide additional water supply, treatment conveyance, <br /> and storage facilities to increase its system capacity. <br /> <br /> 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.