Laserfiche WebLink
-- Recommended Improvement Plan <br /> <br /> roadway in Al_smeda County (approximately three miles in length) has tight <br /> curves and narrow shoulders with advisory speeds along curves of less than 35 <br /> mph. Vasco Road is expected to have a Level of Service F in the year 2010. <br /> <br /> As much as the Plan calls for a policy limiting the capacity of Vasco Road to two <br /> lanes, it is necessary that this roadway be realigned to improve traffic flow and <br /> safety. Alameda County is currently seeking funds to improve the section of the <br /> roadway from the new Vasco Road to the Livermore City Limit. This proposed <br /> improvement includes realignment of the roadway, widening of shoulders,a nd <br /> installing passing lanes without increasing its capacity, consistent with the <br /> standards being used in the Los Vaqueros-Vasco Road project. <br /> <br /> Projected congestion on this roadway cannot be directed to a particular develop- <br /> ment but its future congestion is truly the result of developments in the region. It <br /> is also recommended that subregional traffic mitigation fees be used to improve <br /> this futility. <br /> <br /> Transit Improvements <br /> <br /> The key transit improvement in the Tri-Valley is the extension of BART to Dub- <br /> lin/Pleasanton with two local stations. Local WHEELS routes will be rerouted to serve <br /> the BART stations and create transit centers with timed transfers between modes. <br /> WHEELS and County Connection routes will also need to be rerouted and augmented <br /> to serve new development areas: North Livermore, East Dublin, and Dougherty Valley. <br /> In addition, nine new express bus routes are included in the plan to serve the follow- <br /> ing corridors not served by BART: 1-680 north to Walnut Creek, Vasco Road to East <br /> County, and 1-680 south to Fremont. <br /> <br /> The Tri-Valley Transit Plan has been developed to correspond to expected funding <br /> levels. Since the area is expected to almost double in population, the assumption is <br /> that transit funding will also double. It is important to note that this assumption may <br /> not be realized. Transit funding may not keep pace with population increase. Never- <br /> theless, the plan includes the provision for significant new services plus greater use of <br /> existing routes that have available capacity. Additional riders can be served without <br /> additional investment. <br /> <br /> Note, however, that the development pattern in the Tri-Valley is one of overall low <br /> density, and the new areas proposed for development will generally reinforce the low- <br /> density pattern. The low-density pattern does not support the extensive use of transit <br /> or cost-effective transit operations. If transit is to serve a much greater role than it <br /> does today, development densities will need to increase. <br /> <br /> Growth Management <br /> <br /> The TVTC recognizes that its mission is not to p]an land use. Land use inputs to the <br /> plan came from the planning department of each member jurisdiction. Projections are <br /> also available from ABAG, and the "expected" land use on which the plan is based is <br /> <br />' Barton-Aschman Associates, Inc. 128 <br /> <br /> <br />