Laserfiche WebLink
- - Recommended Improvement Plan <br /> <br /> Central and East Contra Costa County will fill up the Tri-Valley freeways even if Tri- <br /> Valley jurisdictions do not grow. Therefore, the TVTC will accept congestion at the <br /> gateways recognizing that while it is not ideal, at least it will minimize through <br /> traffic. The focus then shifts to maintaining adequate levels of service, and providing <br /> transit options, for trips within the Tri-Valley. <br /> <br /> The transportation plan succeeds in avoiding congestion on the arterial system. Also, <br /> 1-680 between Alamo and Route 84 is expected to flow smoothly. Level of Service F <br /> conditions, however, are expected on 1-580 westbound in the morning and eastbound <br /> in the evening between Tassajara Road and North Livermore Avenue. This would be <br /> partially alleviated with high occupancy vehicle lanes and ramp metering. <br /> <br /> Transportation Demand Management (TDM) <br /> <br /> The TVTC supports TDM measures; however, TVTC does not want to base the <br /> Transportation Plan on unrealistic TDM goals without supporting programs. Through <br /> the plan process, the Bay Area Air Quality Management District (BAAQMD)-mandat- <br /> ed average vehicle ridership (AVR) of 1.35 was tested. This applies to employers with <br /> 100 or more employees. The TVTC estimated that such large employers make up only <br /> about 10 percent of all employment. This, coupled with the fact that commute trips <br /> make up about 35 percent to 40 percent of the PM peak-hour traffic stream, means <br />-- that the BAAQMD mandate will have negligible impact on traffic levels. <br /> <br /> The TVTC also investigated the impact of achieving an AVR of 1.35 for all employers, <br />-- throughout the Bay Area, large and small. Compared to the "nmb~ent" AVR of 1.10- <br /> 1.15, this would be a 20 percent improvement. Given the commute trip proportion of <br /> total PM peak-hour traffic, a 20 percent increase in AVR would translate into 7 <br />-- percent to 8 percent less traffic on the roads. While this would create a significant <br /> improvement in operations, it would not significantly reduce the need for road <br /> building. Nevertheless, if at least a 10 percent increase in AVR were not achieved, <br /> additional intersection improvements, beyond what are included in the plan, would <br /> probably be necessary. <br /> <br /> The achievement of a 20 percent increase in AVR would not be easy. The TVTC <br /> believes that this would require a significant increase in the cost of solo commuting. <br /> However, the TVTC is not in favor of parking charges. Gasoline tax increases would be <br /> more acceptable, provided they were levied regionwide (including San Joaquin <br /> County). Gas tax increases would encourage commute alternatives and would provide <br /> more money for transportation investments. <br /> <br /> The plan is based on a more-achievable goal of an average 10 percent increase in AVR <br /> for all employers. This increase would be realized through the adoption and enforce- <br /> ment of local trip reduction ordinances. The 10 percent increase in AVR will bring <br />" some of the intersections otherwise projected to be borderline unacceptable back into <br /> compliance with the TSOs. <br /> <br /> -- Barton-Aschman Associates, Inc. 132 <br /> <br /> <br />