Laserfiche WebLink
Action Plan <br /> <br /> Tri-Va!ley Action Plan <br /> Highways--Danville Version (Continued) <br /> <br /> PM Peak-Hour 2010 Expected Intersection LOS Without Action Plan <br /> V/C LOS Unconstrained V/C <br /> <br /> Crow Canyon Road and Crow Canyon PI. 0.68 B <br /> Crow Canyon Road and 1-680 SB Ramps 0.48 A <br /> Crow Canyon Road and Camino Tassajara 1.15 F 1.35 <br />' Crow Canyon Road and Dougherty 0.98 E <br /> Crow Canyon Road and 1-680 NB Ramps 0.68 B <br /> Crow Canyon Road and Camino Ramon 0.89 D <br />-- Crow Canyon Road and San Ramon Valley Boulevard 0.79 C <br /> Crow Canyon Road and Alcosta 0.82 D <br /> Crow Canyon Road and Bollinger Canyon 0.63 B <br /> <br /> ~ Volumes and capacity refer to PM peak-hour, peak-direction of flow. <br /> <br />' Barton-Aschman Associates, Inc. 183 <br /> <br /> <br />