Laserfiche WebLink
-- Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> Facility: San Ramon Valley North of Sycamore <br /> Boulevard At Bollinger Valley Road <br /> <br /> Existing Configuration 5 lanes 2 lanes <br /> Existing Volume~ 900 1,025 <br /> Existing V/C 0.25 0.57 <br /> <br /> 2010 Expected Network <br /> Planned changes: Widening to 4 lanes through Danville; Widening to 4 lanes through San Ramon. <br /> <br /> 2010 Configuration 5 lanes 4 lanes <br /> Volume 1.000 1,540 <br /> Transit Service (buses/hour both di- 10 <br /> rections) <br /> Transit Ridership (peak hour) 84 437 <br /> V/C constrained [before Action Plan] 0,28 0.43 <br /> (unconstrained) <br /> <br /> Traffic Pattern Danville 11% Danville 55% <br /> San Ramon 69% San Ramon 43% <br /> CCC 3% CCC 1% <br /> Dublin 11% Dublin 0% <br /> Pleasanton 1% Pleasanton 0% <br /> Livermore 1% Livermore 0% <br /> Through 0% Through 0% <br /> <br /> TSO to be achieved V/C < 0.90 at inter- V/C < 0.90 at inter- <br /> sectjons. sections. <br /> <br /> Recommended Actions None. <br /> 1. Complete widening <br /> project. <br /> <br />'~ Barton-Aschman Associates, Inc. 189 <br /> <br /> <br />