Laserfiche WebLink
Action Plan <br /> <br /> Tri-Va!ley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br />' Facility: Dublin Boulevard West of 1-680 East of 1-680 East of Dougherty East of Tassajara <br /> Potential Actions <br /> <br /> Highway Solution Widen Dublin Bou- Widen Dublin Bou- <br /> levard to 8 lanes levatd to 8 lanes or <br /> or provide grade provide grade sepa- <br /> separations at rations at <br /> Dougherty, Dougherty, <br /> Tassajara. and Tassajara, and <br /> Fallon. Add HOV Fallon. Add HOV <br /> lanes to 1-580. lanes to 1-580. <br /> <br /> Transit Solution Increase local bus Increase local bus <br />__ service, decrease service, decrease <br /> headways to 5 headways to 5 rain- <br /> minutes. utes. <br /> <br /> TDM Solution Achieve AVR in- Achieve AVR in- <br /> crease of about crease of about <br /> 15%, or restrict E. 15%, or restrict E. <br />-- Dublin trip genera- Dublin ~p genera- <br /> tion to 85% of nor- tion to 85% of nor- <br /> mal. real. <br /> <br /> ' Barton-Aschman Associates, Inc. 201 <br /> <br /> <br />