Laserfiche WebLink
Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) <br /> <br /> Key Locations <br /> <br /> N. of North <br /> Facility: Isabel Extension2 Canyons Parkway <br /> <br /> Exisling Configuration N/A <br /> Existing Volume~ N/A <br /> Existing V/C N/A <br /> <br /> 2010 Expected Network <br /> Planned changes: Extension from 1-580 as a 6-1ane/4-1ane artedal to Vasco Road. <br /> <br /> 2010 Configuration 6 lanes <br /> Volume 3,330 <br /> Transit Service (buses/hour both di- 12 <br /> rections) <br /> Transit Ridership (peak hour) 98 <br /> V/C constrained [before Action Plan] 0.62 <br /> (unconstrained) <br /> <br /> Traffic Pattern Livermore 61% <br /> Dublin t 4% <br /> Pleasanton 13% <br /> CCC 3% <br /> Danville 0% <br /> San Ramon 3% <br /> Through 7% <br /> <br /> TSO to be achieved. V/C < 0.90 at inter- <br /> sections. <br /> <br /> Recommended Actions 1. Secure developer <br /> funding for extension. <br /> <br /> PM Peak-Hour 2010 Expected Intersection LOS Without Action Plan <br /> V/C LOS <br /> <br /> Isabel Extension and Vasco Road 0.60 A <br /> Isabel Extension and North Evermore Avenue 0.68 B <br /> Isabel Extension and North Canyon Parkway 0.92 E <br /> <br /> ~ Volumes and capacity refer to PM peak-hour. peak-direction of flow. <br /> ~ Not a route of regional significance <br /> <br />' Barton-Aschman Associates, Inc. 223 <br /> <br /> <br />