Laserfiche WebLink
Action Plan <br /> <br /> Tri-Valley Action Plan <br /> Highways (Continued) _ <br /> <br /> Key Locations <br /> <br /> Facility: W. Las Posltas~ <br /> (pleasanton)= E. of 1-680 <br /> <br /> Existing Configuration 4 lanes ~ <br /> Existing Volume~ 480 <br /> Existing V/C 0.13 <br /> <br /> 2010 Expected Network <br /> Planned changes: Addition of interchange at 1-680/W. Las Positas; widening to 4 lanes Foothill to Payne, widening to 6 <br /> lanes Hopyard to Stoneridge. <br /> <br /> 2010 Configuration 4 lanes <br /> Volume 1,350 <br /> Transit Service (buses/hour both di- 4 <br /> rections) <br /> Transit Ridership (peak hour) 67 <br /> V/C constrained [before Action Plan} 0.38 <br /> (unconstrained) <br /> <br /> Traffic Pattern Danville 0% <br /> San Ramon 0% <br /> Pleasanton 61% <br /> Dublin 15% <br /> Livermore 10% <br /> CCC 3% <br /> Through 10% <br /> <br /> TSO to be achieved V/C < 0,90 at inter- <br /> sections <br /> <br /> Recommended Actions 1. Enforce existing <br /> growth controls to <br /> ensure achievement <br /> of TSOs. <br /> 2. Reduce through <br /> traffic by constructing <br /> an adequate <br /> Route 84. <br /> <br />Barton-Aschman Associates, Inc. 226 <br /> <br /> <br />