Laserfiche WebLink
Plan Implementation, Monitoring, and Review <br /> <br /> Objectives could still be met. If further transportation improvements are necessary <br /> beyond what are in the TVTP, the jurisdiction should specify how they will be funded. <br /> <br /> The Action Plans for Routes of Regional Significance will be based upon adopted <br /> General Plan land uses, the existing road network, and planned improvements to the <br />- network. Consistency with the Action Plans must be established for any changes to the <br /> General Plan that may significantly reduce the ability of the facility to meet the <br /> Traffic Service Objectives. The Regional Committee will be responsible for establishing <br /> - the type and size of ~menament that will require review by the Regional Committee <br /> and the process for implementing this review. Approval of a General Plan Amendment <br /> found to be inconsistent with the adopted Action Plans may render the jurisdiction <br /> _ ineligible for Local Street Maintenance Improvement Funds from the CCTA. <br /> <br /> Consistency with the Action Plans can be achieved by revising the proposed amend- <br /> ment, adopting local actions to offset impacts to the Route of Regional Significance, or <br /> Council or Board denial of the amendment. <br /> <br /> Growth Management Tools. The TVTP is not intended to be a land use control <br /> document. While the plan is .based on a set of growth assumptions, the plan should not <br /> be interpreted as limiting growth to the assumed levels. Nevertheless, the plan does <br /> establish Transportation Service Objectives, which may indirectly influence growth <br /> rates. Growth beyond what is assumed herein may occur provided the TSOs are met. <br /> <br /> If there are TSO violations, or projected TSO violations, in a Tri-Valtey jurisdiction, <br />- then that jurisdiction can either (a) implement transportation improvements (e.g., mad <br /> widening) to correct the TSO deficiency on that affected network segment, or (b) <br /> implement other measures intended to result in measurable improvements to TSOs on <br />-- the Routes of Regional Significance network and contribute to significant <br /> improvements in air quality. Failing this, the jurisdiction can refer the problem to the <br /> TVTC for joint resolution. In the event that the TVTC cannot resolve the violation to <br />-- the mutual satisfaction of all members, the jurisdiction may modify the TSO standard, <br /> but only if other jurisdictions are not physically impacted. <br /> <br /> The tools and procedures for conducting General Plan updates in Contra Costa County <br /> and analyzing proposed General Plan amendments will be the same as those used in <br /> preparing the Growth Management Elements. If the specific project or policy changes <br /> _ are large enough to meet requirements established by the region in its adopted Action <br /> Plan, the jurisdiction considering the Plan amendment must submit the amendment to <br /> the Regional Committee for evaluation of its impact on the ability to achieve Action <br /> Plan objectives. The Growth Management Program directs the RTPCs to evaluate <br /> proposed amenclments only in relation to issues affecting Action Plan success and <br /> consistency. It will be the responsibility of the jurisdiction considering the Amendment <br /> to either: <br /> <br /> 1. Demonstrate that the amendment will not violate Action Plan policies or the <br /> ability to meet Action Plan Traffic Service Objectives; or <br /> <br /> Barton-Aschman Associates, Inc. 237 <br /> <br /> <br />