Laserfiche WebLink
Recommended Improvement Plan <br /> <br /> The Transit Plan <br /> <br /> The Tri-Valley Transportation Plan includes several tran-~it improvements. These were <br /> developed by a transit subcommittee of the TVTAC. The subcommittee included <br /> representatives from BART, CCCTA (County Connection), LAVTA (WHEELS), and <br /> Contra Costa County. The plan includes the following ms~or components: BART <br /> extension to east Dublin (two stations), park-and-ride lots, express bus service in <br /> heavily traveled corridors, local bus service to new development areas, reoriented local <br /> bus service to serve BART and park-and-ride lots, and decreased headways on existing <br /> routes. For modeling purposes, spedtic bus routes were developed and tested. Howev- <br /> er, the TVTP is not intended to be a detailed long-range plan for transit provision. <br /> Therefore, the specific routes, which are described in the Appendix, should not be <br /> interpreted literally, but as representative of the type of service (headways and <br /> corridors served) that should be provided. <br /> <br /> The following are descriptions of the planned transit service. <br /> <br /> BART Extension: The plan includes the BART extension to East Dublin with two <br /> stations in the Tri-Valley. The extension is currently under construction and is <br /> projected to open in 1996. The p]~nued BART headways are nine minutes. Both <br /> stations are assumed to have .,n.~, .-. -~ ~^ Darkin2 lots. The patronage forecasts from <br /> the traF~c model indicate demand for at least 6,000 parking spaces combined for the <br /> two stations. Two BART feeder bus lines woul~ be operated: one to Bishop Ranch and <br /> Danville, and one to Livemore. Both would have 30-minute headways. <br /> <br /> Par'/~-n-RicZe Lots: The plan includes 11 new park-n-ride lots (See Figure 7-2). These <br /> would be served by various bus lines and could also serve as staging locations for <br /> carpools. <br /> <br /> County Connection: The plan calls for the expansion of service from the current three <br /> lines serving Tri-Valley (30-minute headways) to eight lines. Three lines would have <br /> 30-minute headways and five lines would have 20-minute headways. The lines would <br /> serve Danville, San Ramon, Bishop Ranch, Dougherty Valley, and some would extend <br /> down to the East Dublin BART station. <br /> <br /> WHEELS: Under the plan, WHEELS service would expand from the current 11 lines <br /> with 30-60 minute headways to 21 lines, all with 30-minute headways. The route <br /> system would be extensively revised to serve the two BART stations, park-n-ride lots, <br /> and the newly developed areas of East Dublin and North Livemore. Some routes <br /> would also extend into San l~mon and Danville. <br /> <br />i:larton-Ascnrnan Associates, Inc. 142 <br /> <br /> <br />