Laserfiche WebLink
Rnancial Plan <br /> <br /> Critical Regional Projects <br /> <br /> Since most arterial improvements and extensions are local-serving and will be paid for <br /> by new development, the financial plan needs to focus on the funding of the larger <br /> projects with rel;ional sij~ificance. If' the developer-funded, ass-rned local arterial <br /> improvements are not built, changes to the financing plan would be necessary. The <br /> TVTC developed the following list of criteria to define projects for inclusion in a <br /> potential regional impact fee program: <br /> <br /> 1. The project must involve a route of regional significance as defined by the TVTC <br /> for the transportation plan (see Figure 1-1). <br /> <br /> 2. Transit projects can be included. <br /> <br /> 3. The project must be identified in an adopted plan. <br /> <br /> 4. The project would not be built as a direct developer improvement. <br /> <br /> While not a part of the originally adopted list, a fifth criterion discussed by the TVTC <br /> is that the project should serve more than one jurisdiction. <br /> <br /> By these criteria, the following planned projects would qualify as being regionally <br /> signi6cant. These have been preliminarily determined to be of highest priority for <br /> funding due to their demonstrated need in meeting the transportation service objec- <br /> fives through 2010. <br /> <br /> 1. 1-580/1-680 Interchange. Southbound-to-eastbound flyover. <br /> <br /> 2. Route 84. Four lanes on Vallecitos Road, six lanes on Isabel Avenue, including a <br /> new interchange at 1-580/Isabel. <br /> <br /> 3. 1-680 Au~iZf~ry Lanes. From Diablo Road to Bollinger Canyon Road. <br /> <br /> 4. BART l~ctens~on. From Castro Valley to East Dublin, including two stations in the <br /> Tri-Valley. <br /> <br /> 5. 1-580 HOV Lanes. From Tassajara Road to North Livemore Avenue. <br /> <br /> 6. 1-680 HOV Lanes. From Route 84 to top of Sunol Grade. <br /> <br /> 7. Ramp Metering. Add ramp metering with HOV bypass to all freeway interchanges <br /> in the Tri-Valley. <br /> <br /> 8. 1-680/AZcosta Interchange. Capacity improvements including replacement of <br /> southbound off-ramp with hook r~mp. <br /> <br /> 9. 1-580/l~oothiZZ Ir~erchan~e. Conversion to partial cloverleaf design. <br /> <br />Barton-Aschman Associates, Inc. 150 <br /> <br /> <br />