My WebLink
|
Help
|
About
|
Sign Out
RES 99028
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:25:34 PM
Creation date
3/24/1999 2:45:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/16/1999
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 10 <br /> Vasco Road Safety Improvements <br /> <br />Lead Agency Alameda. COUnty <br /> <br />Description Realign and straighten existing two-lane road and add shoulders. No <br /> additional lanes will be constructed. <br /> <br />Cost Estimate $30 million for a three mile segment. <br /> <br />Status A PSR has been completed for the most northerly one-mile segment. (The <br /> cost estimate for this mile is $10 million.) <br /> <br />Funding This is considered a low-priority TVTC project and no TVTDF funding is <br /> included at this time. <br /> <br />Schedule To be determined. <br /> <br />Project Need This project is needed as a safety improvement. The project is intended <br /> to match recent two lane improvements completed in Contra Costa County. <br /> It would eliminate sharp curves and narrow lanes and add shoulders. <br /> Although the projected 2010 volumes exceed desirable capacity of the <br /> existing and planned two lane roadway, this project is not intended to <br /> address the potential capacity deficiency. It is the current policy of the <br /> City of Livermore and the Tfi-Valley Transportation Council to keep this <br /> section of Tri-Valley gateway as two lanes. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.