Laserfiche WebLink
C. Electrical Permit Fees <br /> <br /> INITIAL PLAN CHECK: <br /> When a plan is required to be submitted, the following fee is required at the 25% of Electric <br /> time plans are submitted Permit Fee <br /> (For subsequent models of same plan, a plan check fee will be collected on an 'as needed' basis only) ($70 m!nimu m) <br /> ADDITIONAL PLAN CHECKS: <br /> <br /> Plans submitted to the Building Department are assumed to be complete and <br /> ready for construction. In some cases, designers submit plans in various <br /> stages of completeness and hence a plan correction list ensues. In all cases Time and Material <br /> the initial plan review fee covers the cost for the first plan review, initial <br /> : response to the first correction, and subsequent plan check only. An additional Basis <br /> charge applies to all plan check correction lists after the first one,and all newly <br /> revised, resubmitted plans. <br /> LEXPE'DITED PLAN CHECK SURCHARGE: ' <br /> 'obs Plan Check fee <br /> <br /> CHANGE Original Permit $23.50 <br /> r <br /> Supplemental Permit <br /> CHANGE which ~ermit had not been canceled <br /> <br /> New Residential Buildings <br /> (The following fees include all w~ring, and electrical equipment in or on each building, or other electrical <br /> equipment on the same premises constructed at the same time. A supplemental permit issuance fee <br /> will also be collected) <br /> Single- or two-family residential buildings <br /> Not including the area of garages, carports, and other minor accessory <br /> buildings constructed at the same time, per square foot $0.042 <br /> Multi-family (apartments and condominiumsJ <br /> Not including the area of garages, carports, and. other noncommercial <br /> automobile storage areas constructed at the same time, per square foot $0.037 <br /> Other <br /> Other types of residential occupancies and alterations, additions, and (See Unit Fee <br /> modifications to existing residential buildings Schedule) <br /> :Private' Swimming Pools <br /> For new, in-ground, swimming pools for single- and multi-family occupancies including a <br /> complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, <br /> water pumping and other similar electrical equipment directly related to the operation of a <br /> CHANGE swimmin~l pool, each :$49.50 <br /> CHANGE Carnivals, CircuseS,'& l'Electric generatorsandelectrica/lydriven rides, each ~'" $23.50 <br /> Other Traveling Shows :~/Vlechanically driven rides and walkSthrough a~tractions, or <br /> CHANGE or Exhibitions Ldisplays having electric lighting, each . $7.25 <br /> CHANGE System of area and booth lighting, each $7.25 <br /> e~anentlyinstalledrides,~ooths, displays, a~tractions ~ Unit Fee <br /> ~TemporaryoPower ' 'Temporaryservice power pole or pedestal, including all <br /> Service, each pole or pedestal-mounted receptacle outlets & <br /> CHANGE appurtenances $23.50 <br /> I__ ' <br /> Temporary distribution system and temporary lighting and <br /> ,,receptacle outlets for construction sites, decorative light, <br /> CHANGE Christmas tree sales lots, fireworks stands, etc. $12.30 <br /> <br />effective with adoption of 1997 UBC <br /> <br /> <br />