My WebLink
|
Help
|
About
|
Sign Out
RES 99025
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:22:56 PM
Creation date
3/31/1999 11:03:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Electrical Permit Fees <br /> <br /> INITIAL PLAN CHECK: <br /> When a plan is required to be submitted, the following fee is required at the 25% of Electric <br /> time plans are submitted Permit Fee <br /> . (For subsequent models of same plan, a plan check fee will be collected on an 'as needed' basis only).($70 minimum) <br /> ADDITIONAL PLAN CHECKS: <br /> <br /> Plans submitted to the Building Department are assumed to be complete and <br /> ready for construction. In some cases, designers submit plans in various <br /> stages of completeness and hence a plan correction list ensues. In all cases <br /> the initial plan review fee covers the cost for the first plan review, initial Time and Material <br /> response to the first correction, and subsequent plan check only. An additional' Basis <br /> charge applies to all plan check correction lists after the first one,and all newly <br /> revised, resubmitted plans. <br /> <br /> EXPEDITED PLAN CHECK SURCHARGE: ' ' ~ 50% of <br /> 'obs <br /> Plan Check fee <br /> <br /> Original Permit $23.50 <br /> Supplemental Permit <br /> had been canceled or fin~ $7.25 <br /> <br /> New Residential Buildings <br /> (The following fees include all wiring, and electrical equipment in or or~ :each building, or other electrical <br /> equipment on the same premises constructed at the same time. A supplemental permit issuance fee <br /> will also be collected) <br /> Single- or _two-family residential buildings <br /> Not including the area of garages, carports, and other minor accessory <br /> CHANGE buildings constructed at the same time, per square foot $0.050 <br /> Multi-family (apartments and condominiums~) <br /> Not including the area of garages, carports, and. other noncommercial <br /> CHANGE automobile storage areas constructed at the same time, per square foot $0.040 <br /> Other <br /> Other types of residential occupancies and alterations, additions, and (See Unit Fee <br /> modifications to existing residential buildings Schedule) <br /> Private Swimming Pools <br /> For new, in~round, swimming pools for single- and multi-family occupancies including a <br /> complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, <br /> water pumping and other similar electrical equipment directly related to the operation of a <br /> swimming pool, each $49.50 <br /> 'Carnivals, Circuses,& ,Electrc generators and electrically driven rides, each '_ $23.50 <br /> Other Traveling Shows :Mechanically driven rides and walk-through attractions, or <br /> or Exhibitions displays having electric lighting, each $7.25 <br /> System of area and booth lighting, each $7.25] <br /> ~Permanen~ly ins~l~d rides,~ooths, displays, attractions ~(See Unit Fee Sche~.)~ <br /> <br /> . pole or pedestal-mounted receptacle outlets & <br /> raPPurtenances $23.'50 <br /> Temporary distribution system and temporary lighting and <br /> receptacle outlets for construction sites, decorative light, <br /> Christmas tree sales lots, fireworks stands, etc. $12.30 <br /> <br />effective January 1, 2000 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.