|
D. Mechanical Permit Fees
<br /> ADD
<br /> ADD INITIAL PLAN CHECK:
<br /> When a plan is required to be submitted, the following fee is required at the 25% of Mechanical
<br /> ADD time plans are submitted Permit Fee
<br /> ADD (For subsequent models of same plan, a plan check fee will be collected on an 'as needed' basis only)($70 minimum)
<br /> ADD ADDITIONAL PLAN CHECKS:
<br />
<br /> Plans submitted to the Building Department are assumed to be corn Dlete and
<br /> ready for construction. In some cases, designers submit plans in various
<br /> stages of completeness and hence a plan correction list ensues. In all cases
<br /> the initial plan review fee covers the cbst for the first plan review, initial Basis
<br /> response to the first correction, and subsequent plan check only. An additionalTime and Material
<br /> charge applies to all plan check correction lists after the first one, and all newly
<br /> revised, resubmitted plans.
<br /> ADD
<br /> ADD EXPEDITED PLAN CHECK SURCHARGE: 50% of
<br /> ADD : fees for "rush" Plan Check fee
<br />
<br /> CHANGE Original Permit 00
<br /> Supplemental Permit
<br /> CHANGE (for which the original permit had not expired, been cancelled or finalled)
<br />
<br /> e(
<br /> installed in or on each building on the same premises constructed at the same time. A supplemental permit
<br /> issuance fee will also be collected.
<br />
<br /> Singie--a~Hy and Buildings less than 3,000 square feet (not including the I ....... $0.032
<br /> two-family area of garages, carports, and other minor accessory
<br /> CHANGE buildings constructed at the same time), per square foot
<br /> Buildings of 3,000 square feet or more (not including the
<br /> area of garages, carports, and other minor accessory $0.038
<br /> CHANGE buildings constructed at the same time), per square foot
<br /> Multi-family ~Not including the area of garages, carports, ~nd other non-]
<br /> CHANGE (apartme. n.ts and commercial automobile storage areas constructed at the $0.046
<br /> condommeums) same bme), per square foot
<br /> 'Other ' L (S e'e'U~it"F"~e
<br /> Other types of residential occupancies and alterations, Schedule)
<br /> additions, and modifications to existing residential buildings
<br />
<br /> aces Installation/relocation of forced-air or gravity-type furnace
<br /> or burner, including ducts and vents attached to such
<br /> appliance:
<br /> CHANGE - Up to and including 100,000 Btu/h, each
<br /> CHANGE - Over 100,000 Btu/h, each ;i i ~ ~iii$16i25ii~
<br /> CHANGE I nst~ll'ati0n/rej~,ation of floor furnace, including vent~ each ' '!'! !~:' ~'~!!: i!i~i'?$13':~'5
<br /> ~lnstall~tioni reloCati~n ~ suspended heater, recessed wail
<br /> CHANGE ~heater orfloor-mounted heater unit, each
<br /> CHANGE Appliance Venffi ".InStallation, relocation ~Frepi~ement, each '
<br /> , Repairs or Addition~ [Repair of, alteration of, d~ addition to each heating
<br /> ~ iappliance, refrigeration unit, cooling unit, absorption unit, or
<br /> !each heating, cooling, absorption or evaporative cooling
<br /> : system, including installation of controls regulated by the
<br /> CHANGE , Mech. Code $12.25.
<br /> 'Boilers, Compres~0rs; ~nd Absorption systems
<br /> CHANGE Up to and including 3 HP Up to and including 100,000 BTU/h $13;15
<br /> CHANGE Over 3 HP to 15 HP Over 100,000 to 500,000 BTU/h $24.25~
<br /> CHANGE Over 15 HP to 30 HP Over 500,000 to 1,000,000 BTU/h ! $33:25
<br /> CHANGE Over 30 HP to 50 HP Over 1,000,000 to 1,750,000 BTU/h , ! $49:50.
<br /> CHANGE ! Over 50 HP Over 1,750,000 BTU/h ; $82:75!
<br />
<br />effective with 1999 ordinance
<br />
<br />
<br />
|