My WebLink
|
Help
|
About
|
Sign Out
SR 06:097
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2006 3:53:20 PM
Creation date
4/11/2006 3:39:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:097
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Treatment Plant <br /> <br />The Dublin San Ramon Services District provides wastewater treatment services to the City of <br />Pleasanton under a number of wastewater treatment and disposal contracts between the two <br />agencies. The District owned and operated wastewater treatment plant is located immediately <br />southeast of the 1-680 / Stoneridge Drive interchange (see Figure VI-I, above). It provides both <br />primary-, secondary-, and some tertiary-treated wastewater (which is utilized for irrigation purposes). <br /> <br />At the wastewater treatment plant, wastewater first passes through screens which remove large <br />objects such as rags, sticks, and cans. It then passes through a grit chamber where sand, grit, and <br />small stones settle prior to removal. The wastewater then moves to sedimentation tanks where <br />most of the remaining solids settle to the bottom as raw sludge. Treatment then entails removing <br />sludge and setting it aside for further treatment. This first phase of sewage treatment is called the <br />"primary treatment" stage (see Figure VI-2), <br /> <br />Secondary treatment takes the effluent from the sedimentation tanks and transfers it to an aeration <br />tank where it is mixed with air and bacteria-infested sludge to further break down the organic <br />matter, After several hours, bacteria activates the sludge, which can be used again, in the aeration <br />tank where it is mixed with new sewage and air. After settling and chlorination, the treatment plant <br />discharges the resulting water into the Livermore-Amador Valley Water Management Agency <br />(LA VWMA) pipeline.' This pipeline transports the wastewater to the East Bay Discharge <br />Authority facility. This facility de-chlorinates and then discharges the wastewater into the outfall <br />system to San Francisco Bay,' The treatment plant does not discharge all water into the pipeline, <br />but uses a portion - after it undergoes additional tertiary treatment - for irrigation in non-residential <br />landscape areas, and parks, <br /> <br />The existing sewage treatment facility recently completed an expansion project to bring the average <br />dry-weather wastewater-flow design capacity from 11.5 million gallons per day (mgd) of <br />wastewater capacity to 17 mgd.' The City of Pleasant on is currently entitled to half of this amount, <br />or 8.5 mgd of the sewage treatment plant's capacity. The city's average annual wastewater flow is <br />approximately 6,0 mgd. The current 8,5 mgd wastewater treatment capacity is sufficient to serve <br />Pleasanton's planned build-out growth as anticipated in this General Plan, <br /> <br />The maximum treatment plant ultimate design capacity is currently planned for 20.7 mgd average <br />dry-weather flow in conformance with the Livermore-Amador Valley Water Management Agency <br />Joint Powers Agency 1997 influent limits. Flows at the treatment plant are not expected to reach <br />17.0 mgd until around 2012. The Dublin-San Ramon Services District has not begun expansion <br />planning for the increase from 17.0 mgd to the maximum 20.7 mgd, This future expansion will <br />allow PIeasanton dry-weather flows to reach, but not to exceed, 10.3 mgd. The sewer district <br />designed the existing sewage treatment plant to meet this expansion at its current site, <br /> <br />I Dublin San Ramon Services District Website: http'/Iwwwo<;;r.;;n c.om/f'Cm<;;tnlction ~nrnj~cts ,,<prt1on/l:1vwml'l html. <br />11/21/05, <br /> <br />2 Livermore-Amador Valley Water Management Agency website: http'//h1v""m:1 c.nm!F:1ril1tit><;;/T RVWTml Sy~tp.m php, <br />11/21/05, <br /> <br />, Brown and Caldwell, Dublin San Ramon Services District Wastewater Treatment Plant Master Plan, January 1984. <br /> <br />VI-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.