My WebLink
|
Help
|
About
|
Sign Out
SR 06:097
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2006 3:53:20 PM
Creation date
4/11/2006 3:39:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:097
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />preparation of a Health Risk Assessment to determine needed remediation measures for <br />implementation. A future planning effort will determine park facilities for this site. <br /> <br />In addition to new parks, in the near future the City will open a Community Garden at Val Vista <br />Community Park, and will start on the restoration of the Alviso Adobe. <br /> <br />The City will also seek funds to improve some existing recreational facilities. Drainage <br />improvements at the Sports and Recreation Community Park and at the Upper PIeasanton Field <br />would allow more play in rainy weather. Also, a new toddler pool is planned at the Dolores <br />Bengtson Aquatic Center. <br /> <br />These projects will need to be financed through a variety of sources, Recreational needs in North <br />Pleasanton will be financed through residential park dedication fees, non-residential development <br />projects which are conditioned to mitigate park impacts, and other financing mechanisms. <br />Community parks could be financed partially through dedication of land as part of future <br />developments and partially financed by the City's General Fund. The timing for construction of <br />these facilities is determined by the amount of development and is budgeted each year in two-year <br />increments in the City's Capital Improvement Program, <br /> <br />COMMUNITY FACILITIES AND CULTURAL ARTS 21 <br /> <br />One of Pleasant on's major attractions as a community is the quality and diversity of its community <br />facilities including schools, parks, recreational facilities, and civic buildings. Table VI-6 includes <br />a description of existing community facilities and Figure VI-7 shows facilities locations. Several <br />new community facilities and parks are discussed under the Parks and Recreation section. <br /> <br />In recognition of the importance of shared community space, the City has continued to aggressively <br />expand its inventory of community-owned buildings and facilities since the 1996 General Plan, As <br />PIeasanton continues its efforts to expand public facilities, this General Plan will see the completion <br />of the following projects: <br /> <br />. Renovation of the Veterans' Memorial Building on Main Street in downtown. This <br />project will preserve the exterior appearance, restore significant interior finishes and <br />features, and will upgrade the facility to current building codes. <br /> <br />. Construction of the Firehouse Arts Center on the site of the former Fire Station #1 on <br />Railroad A venue and consisting of gallery, classroom and theater space. <br /> <br />. Downtown restrooms, The City is constructing a public restroom at Delucchi Park that <br />will serve the downtown and the farmers' market. The City is considering adding other <br />public restrooms on Main Street as discussed in its 2003 Downtown Specific Plan. <br /> <br />21 Cultural arts include fme arts (drawing, painting, sculpture, engraving, elc.), perfonning arts (drama, dance and <br />music), technical arts (architecture and graphic arts), and crafts (weaving, pottery, wood carving, glass blowing, <br />knitting, crocheting, embroidering, etc,), <br /> <br />VI-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.