My WebLink
|
Help
|
About
|
Sign Out
SR 06:097
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2006 3:53:20 PM
Creation date
4/11/2006 3:39:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/18/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:097
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Program 9.1: Require new development to pay for its fair share of the City's water <br />system master plan improvements, <br /> <br />Program 9,2: Develop a contingency plan for potential water shortages including <br />groundwater management and water conservation. <br /> <br />Program 9.3: Work with Zone 7 to establish and monitor acceptable ranges of <br />underground water levels and recharge when necessary, <br /> <br />Program 9.4: Maintain sufficient water pressure to serve residential, commercial, <br />industrial, and fire flow requirements as determined by the City Engineer. <br /> <br />Program 9.5: Require the installation of water-conservation devices in new construction <br />and additions, <br /> <br />Program 9.6: Encourage Zone 7 to continue its on-going citywide rebate program for <br />water-conserving fixtures and appliances. <br /> <br />Program 9.7: Plant drought-tolerant landscaping in appropriate locations, All <br />landscaping aspects from plant selection to irrigation methods should be designed to <br />reduce water demand, decrease runoff, and minimize impervious surfaces. <br /> <br />Program 9.8: Utilize water reclamation methods to the fullest extent feasible, where <br />safe and nonpolluting, <br /> <br />Program 9 .9: Work with Zone 7 to develop contingency plans for supplemental water <br />sources independent ofthe State Water Project. <br /> <br />Program 9,10: Evaluate water supply as part of the Growth Management Report, <br /> <br />Program 9,11: Undertake programs to educate citizens about water conservation in the <br />home and in landscaping. <br /> <br />Program 9.12: Work with Zone 7 to implement water-facility upgrades to improve <br />water taste and to decrease water hardness. <br /> <br />Program 9.13: In anticipation of planned future growth in Pleasanton, continue working <br />with Zone 7 to plan and provide for sufficient future water supplies. <br /> <br />~t()rrnw:ltp.r F::tr.ilitlp.!':. <br /> <br />Goal 6: Minimize stormwater runoff and provide adequate stormwater facilities to protect <br />property from flooding. <br /> <br />Policy 10: Ensure an adequate storm drainage system to serve existing and future development. <br /> <br />VI-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.