My WebLink
|
Help
|
About
|
Sign Out
SR 06:142
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:17 AM
Creation date
5/12/2006 10:39:44 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:142
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~)(I4(eli D <br /> <br />MmGATlON MONITORING AND REPORTING PlAN <br /> <br />BERNAL PROPERlY PHASE II SPECIAC PlAN AND <br />BERNAL COMMUNnY PARK MASTER PlAN <br /> <br />INTRODUcnON <br /> <br />Mitigation measures are conditions and controls placed on a project to reduce its impacts on the <br />environment. The Bernal Property Phase II Specific Plan and the Bernal Community Park Master <br />Plan are self-mitigating plans, which means that, in general, the mitigation measures that have been <br />identified to reduce potentially significant impacts to a less-than-significant level are already <br />incorporated into the Project's plans. <br /> <br />When an agency approves a project and adopts mitIgation measures for potentially significant <br />impacts disclosed by an environmental impact report, the project proponent is required by California <br />law (Public Resources Code Section 21081.6) to establish a monitoring program to ensure that the <br />mitigation measures are implemented. It is intended that this mitigation monitoring and reporting <br />plan (MMRP) will adequately serve this purpose. <br /> <br />The MMRP presented in the following table addresses the specific topic areas discussed in the envi- <br />ronmental impact report for this project. For each mitigation measure incorporated into the EIR, or <br />policy of the proposed plans that would mitigate an identified potential environmental impact, the <br />MMRP indicates: <br /> <br />. The party responsible for implementing the mitigation measure, <br /> <br />. The timing of implementation, and <br /> <br />. The monitoring agency and action required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.