|
STREET PROJECTS
<br />FISCAL YEAR 1998-99 (QTR 3)
<br />TABLE 2
<br />S TREETS PROJECTS FUNDED PROJECTS
<br />
<br />
<br />
<br />IP#
<br />
<br />
<br />ROJECT DESCRIPTION
<br />1998-99
<br />ADOPTED CARRYOVER k
<br />1996-99 AMENDM1IENTS
<br />
<br />ADOPTED
<br />AMENDMENTS RECOA1H1fNDED
<br />QTR 3
<br />1998-99
<br />MIENDAtENTS FINAL
<br />ADJUSTED
<br />BUDGET
<br />1998.94
<br />895021 Bemal Bridge Painting 434.562 434.562
<br />805005 St. John Emergency Vehicle Crossing 818 818
<br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho/CC CTY 52.892 29,658 82,550
<br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pleas Canal 75,000 (64,026) 10 974
<br />935045 Removal of Old Bemal Hridge Foundations 16.091 16.091
<br />955028 Drainage Improvements at Neal Street and Railroad Street 10.000 10.000
<br />965003 Annual Resurfacing Various City Strects 282.351 (235.533) 46,818
<br />965004 Annual Slurry Seal Project 61 (61) 0
<br />965007 Annual Traffic Button and Line Markers 25.000 (25.000) 0
<br />965019 Traffic Signal Interconnect; Bemal at Independence (1996-97) 75.000 75.000
<br />965021 Bridge Painting (1996-97) 45.000 45,000
<br />965015 [ntemally Illuminated Street Signs (1996-97) 16.000 (16,000) 0
<br />965035 Mohr Ave. Soundwall 91.1 17 (5.097) 86.020
<br />965045 W. Las Positas In[erohange Study 450,000 (66,323) ;83,677
<br />975003 Resurfacing of various City Streets 747.208 235.533 982,741
<br />975004 Sluny Sealing of various City Streets 68,357 (15,937) 52.420
<br />975033 Street Light -Pole Replacement Program 30.000 (30.000) 0
<br />975006 Street Lighting Upgrades 50.000 50.000
<br />975007 Traffic Button and Line Markers 25,000 30,858 55,858
<br />975021 Evaluation and Reclassification of Street Surfaces 44.683 44,683
<br />975027 New Sidewalk & Handicap Ramps 40.716 3.500 44,216
<br />975034 Amador High School Traffic/Pedestrian Signal 165.574 58.000 223.574
<br />975035 Storm Drainage Improvements at Amanda Ct 5.400 2.579 7,979
<br />975036 Seismic Evaluation of Steel Bridge on Bemal Avenue 13.569 13,569
<br />985014 Hopyard Storm Drain lmprovementa 1.256 3.408 4,664
<br />985013 Storm Drainage Improvements on Foothill Rd South of Bernal Ave 62.400 62.400
<br />985015 Storm Drainage Improvements on Sunal Blvd: Junipero St. to N. Mi 70.000 12.000 82.000
<br />958041 Pimlico Drive Landscaping (see Misc CIP) 41.277 41.277
<br />978064 Cameron Avenue Bike Path 65.000 65.000
<br />985003 Resurfacing of various City Streets 885,000 885.000
<br />985004 Slurry Sealing of various City Streets 80.000 15,937 95,937
<br />985033 Street Light -Pole Replacement Program 100.000 30.000 130,000
<br />985042 Storm Drain Improvement -Neal Street 88.500 88.500
<br />985007 Traffic Button and Line Markers 25,000 25.000
<br /> Partial Funding From Outside Sources
<br />945037 Rose Avenue Reconstruction (Pleasanton Ave to Fair Sy 212,852 (212.852) 0
<br />955029 First Street Bridge at Arroyo Del Valle; Interim Improve (ISTEA/HBRR) 4,764,336 (249.550) 4,514,786
<br />965022 Hopyard Rd Resurfacing; Stonerdige Dr. Arroyo Mocho (1996-97) 442.203 442,203
<br />965042 Main St Bridge Seismic Retrofit 216,388 (13.610) 202,778
<br />955057 Canyon Way Widening 351,512 351.512
<br />945032 Vineyard Ave Soundwall 5.000 692 5.692
<br />985016 Dublin Canyon Road Widening 1,688,000 1,688,000
<br /> 1011'/. Funding From Outside Sources
<br />966001 Stoneridge Drive at Santa Rita Improvemenu -NPID 1 156,282 156,282
<br />935030 Extension of Livingston Way 12.000 12,000 24,000
<br />975038 Owens Drive Improvements -Phase 1 217,463 217.463
<br />975039 Santa Rita at Valley Intersection Improvements (NPIDM 1) 34,293 34,293
<br />975040 Street Repairs: Hacienda Business Park II (HBP) 41,000 41,000
<br />975041 Arroyo Mocho Trail: Alamo Canal to Santa Rita Rd. (TEA/'I'DA) 314,853 314,853
<br />985040 Street Repairs: Hacienda Business Park 41,000 41,000
<br />975062 Owens Drive Improvements -Phase II 113,529 113,529
<br />985090 Dublin Reimbursement for Futttrc Projects 691,000 691,000
<br />985043 Traffic Signal Master Upgrade 15,000 15,000
<br />999999 Interchanges Landscape Maintenance (NPID3) 1,091.820 1,091,820
<br /> STREET PROJECT TOTAL 53,413,400 510,27522 5402,817 50 SI4,091,539
<br />Q3st99.xls
<br />
|